Achievement and Highlights of S&T department, Nagpur Division for the month of January 2026

 

1.  E.I and  Yard modification in connection with  augmentation of  3rd line work has been commissioned at Tumsar Road  station (191 routes) by construction/NGP unit. S&T/Open line was actively involved and extended all the assistance required during every stages of this   work.

2. Replacement of IRS point machine by Thick Web Switches have been doneat following stations in the       

 Month of Jan’26:

 

S. N

Station

Pt . No.

Date of Replacement

S. N

Station

Pt . No.

Date of Replacement

1

DGG

108B

27.01.26

7

G

186

29.01.26

2

AGN

191A

02.01.26

8

G

112B

29.01.26

3

NITR

64B

06.01.26

9

G

168

30.01.26

4

BRD

192B

09.01.26

10

KAV

112A

22.01.26

5

WSA

31A

11.01.26

11

TMR

107

24.01.26

6

   G

181A

19.01.26

 

 

 

 

 

 

3. To improve reliability of signalling system, 151 Nos. of over aged LED have been replaced with new LEDs over Nagpur Division {Station wise LED (in nos.)   replacement details are as follows :- RSM-5, KWN-8, HDM-33, GNL-25, DEW-9, AJU-16, WDG-13, LIG-7, BDKD-35 in the month Jan’26.

 

4. New SSDAC has been commissioned between Goberwahi-Tumsar section on 31.01.2026.

 

5. To improve reliability of point operation, old worn-out IRS point machines have been replaced at following stations in the month of Jan’26.

S.N

Station

Pt . No.

Date of Replacement

S.N

Station

Pt . No.

Date of Replacement

1

CRN

31A

19.01.26

4

BRA

21B

08.01.26

2

GGGS

41A

19.01.26

5

BRA

22B

09.01.26

3

MUA

32A

02.01.26

 

 

 

 

 

 

6. Offline Safety seminar held at Nainpur (10 nos. of S&T staff attended) & Tirodi stations (3 nos. of S&T taff attended) on Unsafe practices in relay room, Upkeep of signaling gears at gates & stations, Disconnection & reconnection on 12.01.2026 & 21.01.2026 respectively.

 

7. Worn-out Tongue rails have been replaced in coordination with Engineering Department at following station in the month of Jan’26

 

S.N

Station

Pt. No.

Date of Replacement

1

KAV

154B

27.01.26

2

KAV

166A

28.01.26

3

KAV

154B

27.01.26

 

8. New IPS battery set (200AH) has been installed Hatta road station on 04.01.26.

 

9.  IPS battery set have been replaced at station/LC Gate/Auto goomty in the month of Jan’26.

SN

Station/LC

Nos. of batteries

Capacity

Date of replacement

1

GGGS

55

200AH

25.01.26

2

KWN

55

200AH

29.01.26

3

KT

55

200AH

27.01.26

 

Total

165

 

10. For improving reliability of track circuit, 30 nos. ofglued joints have been replaced in association with Engineering Department in the month of Jan’2026.

 

11. Track circuit batteries have been replaced with new one at the following stations in the month of Jan’26

 

SN

Station

Nos. of batteries

Capacity

SN

Station

Nos. of batteries

Capacity

1

PUE

9

80AH

4

RSM

3

80AH

2

PNJ

3

80AH

5

KWN

6

80AH

3

RJN

3

80AH

 

 

 

 

Total-21

12. The New Internet /Railnet connectivity have been provided at following location in the month of January’2026.

i) Engg. Drawing section/Office      – 02 nos.

ii) Pay Office                                      – 01 no.

iii) Diesel Training School                 – 02 nos.

iv) GSU Office                                    – 01 no.

v) Engineering Control                       - 01 no.  

 

13. 2 nos. Horn speakers on pf no. 4&5 and 01 no. Horn speaker provided at Rasmara station and also tested on 09.01.26.

 

14. New Statcon/48V Battery Charger Installed at Ramtek OFC Hut on 16.01.26.

 

15. The Periodical testing of Wakie -Talkie testing of following Guard/Driver lobby have been done in the month of January’2026.

Sr. No.

Location

Date

Total No. of Tested

1.

NGP

22,23 & 24.01.2026

63 Nos.

2.

KAV

17, 19  & 21.01.2026

73 Nos.

3.

TMR

29.01.2026

21 Nos

4.

G

30.12.2025 & 06.01.2026

258 Nos.

5.

CWA

06.01.2026

11 Nos.

6.

NAB

22.01.2026

17 Nos.

7.

JBP

27.01.2026

27 Nos.

8.

NIR

03.01.2026

30 Nos.

9.

DGG

03 & 09.01.2026

 131 Nos.

 

 

16. The OFC/6 Quad cable have been replaced at the following locations in the month of January’ 2026.

 

Section

Location

Purpose & Quantity

RJN-PMS

 

LC No. 459

For 6 Quad cable diversion for LHS work 73Mtrs.

MUP-RSM

LC No. 451

For OFC cable diversion for ROB work   260 Mtrs.