Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook View Content in Hindi
National Emblem of India

About Us

Passenger & Freight Services

Recruitment/News/Press Release

General Public Info.

Dept./Div of SECR

Tender Related

Contact Us/Other info.

Dept./Div of SECR
   Divisons
      NAGPUR
         Mechanical DSL
            Activities & Achievements


 
Bookmark Mail this page Print this page
QUICK LINKS
Activities & Achievements

Performance & achievement for 2021-22 ofDiesel Loco Shed, Motibagh/Nagpur

Sl

No

Parameter

Yearly Target for 2021-22

Achievement up to Mar22

Remark/ Improvement

1

Outage (Freight)

5% above the standard target (Calculated Target – 37.21)

39.6

Improvement by 6.4%

2

Effective Outage (Excluding Dead Outage) for Diesel locos

More than the standard target (Calculated Target – 36.00)

38.73

Improvementby

7.5 %

3

Equipment Failure/100 loco/month

5.00 (1.67 / month for DLS/MIB= 20 in a year)

10

Improvement by 50 %

4

Punctuality Loss (In-direct Cases/Months)

0.20 per month

1

Improvement by 58.33 %

5

SFC-Goods (per 1000 GTKM)

Average (1.85 / month)

1.84

Improvement by 0.54%

6

Lube oil consumption in DSL loco (L/100 EKM)

Average (1.50 / month)

1.49

Improvement by 0.66%

7

LO to FO Ratio

Average (0.50 / month)

0.49

Improvement by 11.2 %

8

Ineffective Percentage of Goods loco

84 (7/ month)

5

Improvement by 30 %

9

HSD oil shed consumption (average per loco per year)

150.7 ltrs.

142.46 ltrs.

Improvement by 5.46 %

10

Achievement/Good work done













































a)DLS/MIB holding has increased from 17 to 41 loco. With existing staff strength (47% as per yardstick) maintenance work of additional locos is being managed.

Whereas Diesel loco utilization has been increased in year 2021-22 as compared to previous year and loco failure also reduced.

b)Target achievement: Daily outage target for DLS/MIB/NGP is 37.21 (5% above standard target) and shed has achieved an outage more than the target - (Average outage for the year 2021-22 uptoMarch’22 is 39.6).

c)Major Schedule done:-36% more Heavy schedule done during year 2021-22 as compared to previous year.

Year

Hyly(M18)

Yly(M36)

3Yly(M72)

Total

2020-21

4

10

0

14

2021-22

18

1

3

22

d) Safety seminar for awareness of staff conducted at DLS/MIB in this year:- 10 Nos.

e) Refresher course training attended by staff in 2020-21: - 113 Staff

2021-22: - 157 Staff

f) HSD oil shed consumption has been reduced by 5.46% in year 2021-22 as compared to previous year.

g) Computerized Fuel Model System started in RCD/MIB in Dec-2021

h) Plantation: 05 plantation was done in the month of Mar-22, total 30 plantation was done during 2021-22

             

Renewal of water consent, air consent and authorization for disposal of hazardous waste has been obtained in Aug-2021 from Maharashtra pollution control board whose validity is uptoMarch.2027.

i) Test stand :- Lube oil relief, regulating and bypass valve testing stand fabricated at DLS/MIB during mar-2022.

j) Water jet cleaning machine:- It is being locally fabricated by shed staff, likely to be completed by 20 mar-2022.

k) PCSO cash award (Rs. 5000/-):-group cash award of Rs. 5000/- for overall maintenance quality and management to supervisor and staff ofDLS/MIB on 19.03.2022, and 5000/- on 20.01.2022














































l) GM’s annual inspection group cash award of 7500 announced during GM’s annual inspection for providing stand by diesel loco on 18.02.2022.

Performance & achievement of DEMU Shed Gondia for the year 2021-22

Sl No

Parameter

Target 2021-22

Achievement up to Mar. 22

Remarks

1

a)Availability of

DEMU/MEMU – Train

b) Cancellation of train on DEMU/MEMU Account.

14

NIL

15

Nil

(Target for availability is 14), improvement by 7%

2

DEMU – Failure ( Against holding of 17 DPC and 52 TC)

06

04 against target of 6

improvement by 33%

3

Total Km/ Failure of DEMU

Nil

183243

Improvement

4

MEMU – Failure ( Against holding of 18 DMC and 54 TC)

5

03 against target of 5

Improvement by 40%

5

Total Km/ Failure of MEMU

Nil

363267.3

Improvement

6

SFC

5.45

4.57 against target of

4.57up to Feb22. Improvement by 16.15%

7

IOH(DPC+TC)+ AOH of Tower Car

07 DPC

26 TC

12+31+1=44

IOH of 12DPC and 31TC , 1 Tower car already done against target of 7DPC+26TC. Increased IOH by 33.33% uptoMar 2022.

8

Energy Regeneration /Consumption ratio

NA

1864609/6193738

(30%)

Energy regeneration

ratio increased by 10.67%

9

Energy Regeneration

NA

1864609

2.5 times more as compared to 2020-21

10

IC

21

24

Increased by 14.29%

11

Accident &Derailment on account of DEMU/MEMU

NIL

NIL

At par

12

Good Work:

1. 100% implementation of UDM in store.

2. Achieved ISO certification 14001:2015, 45001:2018,9001:2015 , on 22.07.2021

3. Maintenance of 06 Nos. 03 phase AC MEMU Rakes in existing staff strength of DEMU shed. There is no staff sanctioned for MEMU maintenance, only there is sanctioned staff of DEMU, which is being utilized for maintenance DEMU as well as 3 phase MEMU in Jan-22. There is a shortfall of 142 staff.

4. Started AOH schedule of tower wagon from month of mar-2022.

5. Formation of 12 car from 08 car of 3 phase AC MEMU and put in train service from G-JSG & JSG-G.

6. Safety seminar arranged in DEMU Shed and counseled all staff of DEMU Shed, Gondia. Total 10 safety seminars conducted.

7. In house fabricated a model of train 18 from using scrap material.

8. Implementation of E-Office for all works.

9. Already locally fabricated different testing stand In house fabricated a)BMBC test bench for testing of

brake cylinder.

b)In house fabricated multi valve test bench for testing of different valves of air brake system.

c)In house fabricated temperature test bench in electrical switch. Load box testing stand has been fabricated
.

10. DEMU shed Gondia has locally fabricated a test stand for testing of MEMU rake /DMC without OHE where main compressor, All blowers (Traction transformer blowers, TCC blowers, Auxiliary convertor lower etc, and all EP (Electro pneumatic systems can be tested.

11.DEMU Shed Gondia fabricated 4 racks for storage of materials at stores.

12. In house fabricated EP test bench for testing of different make EPbrake controllers EP bench unit.

13. New work undertaken: Started AOH schedule of tower wagon from 8th mar-2022

14. PCME cash award(Rs. 5000/-):

cash award for propermaintenance of DEMU and MEMU in October 2021-Rs 5,000/-

15.DRM cash award ( Rs.10,000/-)

cash award for innovation- test stand for testingof MEMU rake /DMC without OHE where main

compressor, All blowers (Traction transformer blowers, TCC blowers, Auxiliary convertor lower etc, and

all EP (Electro pneumatic systems can be tested –

16. DRM cash award(Rs. 1000/-): Proper utilisation and implementation of UDm. Rs. 1000/-




Source : South East Central Railway CMS Team Last Reviewed : 09-01-2023  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.