         Signal & Telecommunication
            Activities & Achievements


 
Bookmark Mail this page Print this page
QUICK LINKS
Activities & Achievements


SAFETY ACTION PLAN FOR 2023-24

S N

Item

Unit

Target to be Proposed 2023-24

Prop Target Oct’2023

Progress Till Oct’2023

1

Replacement of overage Signalling gears

 

 

 

 

a)

Other Signalling Gears (PI/EI/RRI) (No. of station)

No.

2

1.17

3

2

Safety Integrity test for EI/PI/RRI (No. of station)

No.

8

4.67

13

3

Provision of BPAC (No. of Section)

No.

1

0.58

2

4

Provision of RTU at Interlocked LC gate/IBS/Relay huts (No. of location)

No.

4

2.33

19

5

Networking provision of Data Logger/RTU

No.

3

1.75

21

6

Provision for monitoring of fire alarm & smoke detection system of relay room/goomty through Data Logger/RTU (No. of station)

No.

1

0.58

8

7

Reconciliation of SIP with existing yard & modification if any, thereon. (No. of station)

No.

2

1.17

17

8

Walkie-Talkie/VHF set :

 

 

0.00

 

(a)

Supply provision of Walkie – Talkie

No.

0

0.00

0

(b)

Provision of repairing of Walkie-Talkie/VHF set (06 months assured working on post repairing)

No.

300

175.00

176

9

Provision of Special Training/Refresher/Equipment course :

 

 

 

(a)

Officer’s level

No.

4

2.33

1

(b)

SSE/JE Level

No.

30

17.50

22

(c)

Technician level

No.

50

29.17

40

10

Accident on S&T account

 

 

 

 

(a) No. of accidents due to Equipment failure

Nos.

0

0.00

0

 

(b) No. of accidents due to Human failure

Nos.

0

0.00

0

11

Failure of equipment on unsafe side

Nos.

0

0.00

0

12

Safety Inspection by S&T officials

 

 

 

 

(a) Safety inspection at Sectional Inspector level (Monthly)

Nos.

588

343.00

296

 

(b) Safety inspection at Incharge Inspector level(Quarterly).

Nos.

196

114.33

99

 

(c)Safety inspection at ASTE, DSTE, Sr.DSTE’s level (Yearly)

Nos.

61

35.58

120

13

Joint Inspection of S&T officials

 

 

 

 

 

(a) Foot plate inspection by CSI/CL.I & CDTI (Quarterly)

Nos.

40

23.33

60

 

(b) Points & Crossings by CSI/PWI

Nos.

185

107.92

116

14

Training of safety category staff (Refresher)

 

 

 

 

(a) Signal Supervisors ( Once in 5 years )

Nos.

4

2.33

5

 

(b) Telecom. Supervisors ( Once in 5 years )

Nos.

1

0.58

0

 

(c) Signal Maintainers ( Once in 4 years )

Nos.

10

5.83

19

 

(d) Telecom. Maintainers ( Once in 4 years )

Nos.

5

2.92

5

 

(e) Safety Seminar (2 Nos.per month.Divn.)

Nos.

24

14.00

22

15

Periodical Medical examination of safety category staff

Nos.

10

5.83

17

16

Overhauling of Signalling equipment

 

 

 

 

a) Block instrument (DLBI-once in 7yrs & SLBI/TLBI-once in 7 years)

Nos.

16

9.33

10

 

b) Cable meggering

Stn.

5

2.92

4

17

Sign off Register - Compliance of defficiencies reported

Item

All

All

All

18

Maintenance of VHF communication (for Gd/Driver):

 

 

 

 

a) Replacement/repair of defective sets.

Nos.

As per defective sets received.

-

1

19

Joint checking of emergency sockets (Quarterly by SE(Tele) & CTFO)

Nos.

1492

870.33

1254

20

Inspection of ART & ARME equipments

 

 

 

 

(a) Inspection at Inspector level (Monthly).

Nos.

16

9.33

7

 

(b) Inspection at Officer level (Quarterly)

Nos.

4

2.33

4

21

Inspection & testing of assets for Disaster Management

 

 

 

 

(a) Inspection at Inspector level (Monthly).

Nos.

16

9.33

7

 

(b) Inspection at Officer level (Quarterly)

Nos.

4

2.33

4

22

Provision of shortfall safety materials in ART/ARME.

 

 

 

a

Provision of one more satellite phone at all ARTs

Nos.

0

0.00

0

b

Provision of System showing the coverage availability of measure mobile service provider in ART

Works done for improvement of  reliability

1. Standby Axle Counters has been provided to minimize the axle counter failures.

2.Sliding Barrier has been commissioned to ensure Signaling movement of trains while failure/damage of main barrier.

3.Earth Leakage Detector (ELD) has been provided to detect the faulty cables and networking with datalogger has been done to monitor it.

4.Air conditioning has been provided in the relay rooms to minimize the relay contact failures.

5.Fire detection and alarm system has been provided in the relay rooms to detect the fire.

6.Mechanical lifting barriers are converted in to electrical lifting barriers to minimize the failures.

7.Normal points are converted in to thick wed to increase the speed of 1stloop line from MDH-DPH section. 

8.Fuse Auto Changeover & alarm system has been provided.

9.LC Gate circuits shifted from location boxes to new Relay Room/Goomties.

10.Faulty cables have been changed with sufficient numbers of spare cores.

 Works to be done for improvement of reliability .

1. Double distant signal will be provided in DUG-BPTP section to increase the sectional speed.

2. Strengthening of Railnet and internet will be done so that e-office work can be done smoothly.

Major system improvement done from Apr- 2020 to Aug’23

1.New panel interlocking station Antagarh (AAGH) has been commissioned on 21.08.2020 in DRZ-ROW ‘D’ SPL route between Keoti and Taroki station.New Electronic Interlockingstation Naya Raipur has been commissioned on 12.09.2022 in R-LAE ‘D’ SPL route between LAE & MNDH stations.New PI station Taroki has been commissioned in Antagarh - Rowghat section on 24.05.2023

2.TLBI has been replaced by UFSBI between MXA-RSA, RSA-GDZ, GDZ-LBO, LBO-BXA & KYS-BXA in connection with RE modification work and fuse segregation done all the Signals & Cutting In Relays HPR & DPR commissioning done at RSA,GDZ,LBO &  BXA station.

3.Modification of existing panel of FMY yard Bhilai in connection with proposed rail related project at PP Yard under modification and expansion of Bhilai steel plant between ‘P’ cabin and Marauda has been done. Modification of existing Electronic Interlocking at LAE has been done to suit double line between LAE-Naya Raipur and commissioned on 12.09.2022.Modification of existing panel interlocking of Antagarh station and new non electrified line between Antagarh-Taroki has been commissioned on 09.08.2023

4.Store Management system has been implemented in all Signal and Telecom stores.

5.Standby SSDAC has been commissioned by replacing the Analog BPAC between D-Cabin and A-Cabin on DN Line, MID Line and By Pass Lineand P/cabin-CEE.

6.RKT Less Gate commissioned at LC No 438 at KM 846/22-24 at D/Cabin Yard Gate,L.C No.442 at KM.859/17-19of BQR staion and RSA DD-19 at KM-889/7-8.

7.Air conditioning has been provided at MDH ,URK,SZB & E/Cabin station, LAE, BMY/C, Naya Raipur, MNDH RVH.

8.Safety integrity and Correspondence testing has been done at DPH, BYL, NPI, TLD,SLH, MDH, URK, C/CABIN, RVH,DGS,BKTH/E, BKTH/W ,R/East, RSA,FMY, G/Cabin, CEW ,DLBS, H-Cabin, GDZ, E-Cabin, OLY, SZB, P-cabin, LAE, BXA, BMY Central, E/Cabin, H/Cabin, DRZ, LAE, NAya Raipur, MNDH, RVH, BPTP, GUDM, C/Cabin (16.07.2023), A/Cab (17/22.08.2023) and D/Cab (17/22.08.2023).

9.PPTC fuse has been provided in all track circuit of E/Cabin & I/Cabin and 15nos external circuit of LBO  and A/Cabin.

10.Interlocked LChas been closed to road traffic: LC No-445 at Km 866/17-19 of DUG yard on 24.09.20.  LC No.421 at Km 833/22-24 between Raipur-Sarona on 20.05.21. LC No.383 (km: 763/17-19) between NPI-BYT on 03.03.2022. LC 439 (km: 850/11-13) between BIA-H/C & G/C closed on 30.03.2022.LC No- 444 (Raipur Naka Gate) at Km 864/23-25 on 05.11.2022, L.C gate No.RV-1 at Km: RSD/174-175 between R-RVH in lieu of RUB on 29.03.23.

11.Mechanical lifting barrier has been replaced with Electrical lifting barrier hasbeen commissioned at RSA DD-19 at KM-889/7-8 on date 09.10.20 and LC Gate No. DD-33 km: 902/11-12 between GDZ-LBO stations on 14.02.2021, RV-5 (on 03.03.21), RV-1 (on 10.01.21
), RV-3 (on 16.03.21).

12.Sliding barrier (Four-Two-Ka-One) has been commissioned at LC Gate No.386 (‘C’ Class at km:786/13-15 ,LC Gate No. 387 (‘B’ Class at km: 771.658 New) between BYT-HN , LC Gate No. 403 (‘B’ Class at km: 800/21-23)  and LC Gate No. 404 (‘A’ Class at km: 802/24-26), DD-19 at KM-889/7-8 on date 09.10.20 and LC Gate No. DD-33 km: 902/11-12, LC Gate No.401 (‘SPL’ Class at km: 799.856) between BKTH-SLH, RV-17 (0n 05.03.21), LC-407 (on 09.03.21), LC-408 (on 10.03.21), DD-4 on 22.09.2021, DD-5 (05.10.21), RV-6 (29.10.21), RV-07 (03.11.21), LC 390 (30.11.21), LC 413 (04.12.2021), RV-14 /Siding (08.12.2021), DD-50 (21.12.2021), RV-10 (06.12.2021), LC 385 (03.06.23) & LC 392 (on 31.07.23).

13.Modification of the existing sliding Barrier with Four-Two-ka-One is commissioned at SLH LC gate No. 405 (KM 805/23-25) on 02.07.2021 & LC 398 on 24.12.2021.

14.L.C gate interlocked and commissioned with sliding barrier : RV-20 on 05.08.2021, DD-48 on 07.01.2022, DD-15 on 11.01.2022, RV-13 on 13.01.2022.

15.Standby control phone has been provided at NPI, BYT West Cabin, BYT Center, BYT East, DGS, BSP RRI, BSP DY.SS, BYL station, HN, BKTH East, BKTH West, SLH, HN E/O, MDH, G-Cabin, H-Cabin, P-Cabin, BIA   station, BQR, RRI/DUG, DySS (Central)DUG & DLBS. MXA.

16.New TPC control phone has been installed at GDZ and RSA.

17.High reliability signal circuit implementation completed at NPI, at DPH on 08.08.2021, BQR on 21.08.2021, C/Cab on 14.09.21, BKTH E/W on 08 & 20.09.21, SZB (30.10.21), BMY Cen (29.10.21), A-cab (10.10.21), DLBS (10.10.21), H/Cab (10.12.21) & D/Cab (31.12.2021), BYL (05.01.2022), G/Cabin (04.02.2022),KMI(24.04.22),BIA(19.04.22) & BYT/East (10.04.22).

18.Latest RDSO version IPIS commissioned at Durg on 14.02.2021, R (01.11.2021).

19. Temporary Emergency panel provided at BPTP station.

20.HBL make Mini IPS has been installed at L.C-RV-7 & RV-10. New IPS commissioned at LC 386 (HBL) & L.C -RV-20 (Statcon).

21.New Electronic Interlocking (EI) has been commissioned at Lakholi (LAE; PI to EI on 05.08.2021), MNDH (LF to EI on 13.09.22), RVH (PI to EI on 12.09.2022).

22.Analog Axle Counter has been replaced by DC track circuit :  at Risama (RSA) station and commissioned on 18.08.2021 (05 nos: 41T, LLT1, LLT2, LLT3 & 31BT), at Balod (BXA) station and commissioned on 21.09.2021 .

23.Data logger of Raipur station has been modified for linking arrival/departure of train timings to Control Office Application (COA) and commissioned on 22.08.2021.

24.Overhauling of Double Line Block Instrument for BYT/W- HN E/O section has been done on 25.08.2021. Overhauling of lever frame at BKTH (W) has been done on 30.08.2021, BKTH Ex-yard on 13 & 14.11.2021 .

25.Overaged mechanical Lever Frame at I, J & F cabins have been eliminated by commissioning of Distributed Electronic Interlocking (Hitachi Rail STS make, hot standby) with dual VDU at BMY Central on 29.10.2021.

26.Data logger (Efftronics) has been commissioned at BMY Central. Data logger at Kendri Center and RTUs at Kendri Yard Gate RD-22 & ‘Y’ Junction goomty have been commissioned and networked on 27.02.23

27.Efftronics make RTU with 128 Digital Inputs has been commissioned at LC Gate No. 440 & LC Gate No. 442 and networked to Division. Efftronics make RTUs have been commissioned at G/Cabin East Goomty (18.11.22), LC 429 (16.11.22), LC 430 (13.11.22), LC 436(10.11.22),L.C DD50(29.11.22), LC 442 (24.11.22), LC DD-19 (17.12.22). Stand alone RTU commissioned at LC 401, LC 416, LC 425 & LC RV-1, DD-08 and 128 digital inputs RTUs at L.C No.386 & 387 has been commissioned and networked. Remote Terminal Unit (RTU) has been commissioned at LC Gates No.375 KM: 739/3-5 between BYL-DGS and LC No.376 KM:741/25-27 between DGS-NPI and networking has been done.

28.Fire alarm & ELD has been provided and networked with data logger ay BMY Central.

29.Fuse Alarm has been provided at DLBS, BMY Central, MNDH, RVH  & Naya R.

30.Fire alarm has been commissioned and networked with data logger at P-cabin,  A-cabin & C-cabin, RSA, GDZ, FMY, CEE, CLW, CLE, CEW , ORLY, DLBS, DRZ, KYS, BXA, LBO, GUDM (06.02.22), BPTP (09.02.22) ,KETI (12.02.22), BYT/E(13.04.22), HN/E(30.04.22), BKTH/E(29.04.22) & R/East 18.04.04.22), MNDH (13.09.22), RVH (12.09.22) & Naya R (12.09.22).

31.Implementation of Remote Diagnostic and Predictive Maintenance system at LBO & MNDH (May’23) station.

32.Double distant signals have been commissioned at MXA, RSA & GDZ Station on 14.03.22 , at LBO station between LBO-GDZ and LBO-BXA on 13.05.2022, in BXA-KYS section on 14.07.2022 & MXA-DLBS section on 30.07.2022, DRZ-KYS & DRZ-GUDM section on 18.10.22. Double Distant Signaling has been commissioned at GUDM (09.01.2023) & BPTP (10.01.2023), DD-04 (26.03.23), DD—05 (26.03.23) & DD-08 (26.03.23).        

33.BPAC media redundancy by OFC through MAPLE has been done in middle line of BYL-DGS, DGS-NPI, BYT-NPI, HN-BYT, HN-TLD, TLD-BKTH, BKTH-SLH, SLH-MDH & MDH-URK sections. BPAC media redundancy by OFC through MAPLE has been done in middle line of BIA-BQR & in all three lines between SZB-KMI sections.

34.BPAC has been dismentled in LAE-MNDH and newly installed in LAE-Naya R & Naya R-MNDH block sections.

35.Data logger validation and checking status of non operated relays has been done at NPI/W, BYT-HN IB. D/Cabin Goomty-1, D/Cabin Goomty-2, DLBS East Goomty, DLBS MXA Goomty & DLBS Center Relay Room, LAE, MNDH (C/E/W), Naya Raipur (C/E/W), RVH (C ).

36.Signals S/C/SH-13 & S/C/SH-34 of Line No.-2 of DURG station have been shifted for increasing the CSL of line No -2 from 680mtr to 698mtr.

37.0.63A Fuse for signal lighting has been provided at BKTH, TLD , SZB,  BYL, DGS, NPI, H/Cabin, A/Cabin station, RSA, DRZ, GUDM, BPTP, DD-5, DD-15, DD-19, MDH, C-Cabin & KMI.

38.Auto Signaling has been commissioned between DURG & RSM on 22.11.2022, in DURG - BIA section (on 06 & 07.04.2023)&BIA-KMI section in UP line (Route KM 11.25) on 08.09.2023.

39.ELD and Fuse monitoring systems have been installed at L.C 385,386,387,DD-4 DD-5 , DD-10 , 442,  DD-19, LC 430. ELD has been installed at LC 436.

40.Inverter has been installed at KMI Parsada Gate(L.C-429) on 09.11.2022.

41.New station KENDRI (Centralized EI M/S Hitachi Make, Hot Standby with dual VDU) has been commissioned on 27.02.2023 in connection with the New line work in Naya Raipur –  Dhamtari section.

42.LC gate with sliding barrier has been interlocked and commissioned: LC NO RD-22, ‘C’ Class at KM 850.775 on 27.02.23; DD-08, ‘C’ Class at KM 874/2-3 on 26.03.23.

43.Yard remodeling & New RRI Panel has been commissioned at MXA on 26.02.23.

44.Panel Interlocking of H/Cabin station has been replaced with Centralised EI (M/S Hitachi STS, Hot Standby with dual VDU) and commissioned on 24.04.2023 in connection with additional loop line work.

45.Interlocked L.C gate No.442 at Km: 859/17-19 between BIA-BQR in connection with Auto sig work and L.C gate No.425 at Km: 829/1B-3B between URK-SZB has been closed has been closed in lieu of RUB.

46.Existing Panel Interlocking of Raipur station has been replaced with Distributed EI (M/S KYOSAN, Hot Standby with dual VDU) and double line between RVH and Raipur has been   commissioned on 10.05.2023 in connection with the doubling work of R-TIG section.

47.Panel interlocking has been replaced by Electronic Interlocking (Hitachi make, Centralized EI) at G/Cabin (BMY) on 25.08.2023.

48.Panel interlocking has been replaced by Electronic Interlocking (Hitachi make, Centralized EI) at G/Cabin (BMY) on 25.08.2023.

49.MSDAC of Sigma make have been commissioned at RSD station in lieu of Analog Axle Counters; for 5 Track sections with 2 evaluators & 12 DP. Analog Axle counters replaced with Sigma make MSDAC (15 DP, 7 Track sections) at DRZ station and commissioned on 16.10.2023.

50.Voice recorder master/slave gate telephone has been provided at 10 Non Interlocked LC Gates Nos. 374, 379, 382, 389, 393, 399, 406, RV-12, DD-24 & DD-62 on 20 & 21.09.2023. With these, voice recorder has been provided at all non interlocked LC gates (Total 12 LC gates) in Raipur Division.








Source : South East Central Railway CMS Team Last Reviewed : 09-11-2023  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.