AAchievements of Electrical (OP) department of Raipur Division
(April’22 to Mar’2023):-
- During the period 01-04-2022 to 31-03-2023, idle diesel Locomotives on line were shut down for 73354 hours with a view to save valuable HSD oil. The shutdown duration was 36.66% more as compared to same period of previous year.
- By Shutting down of idle diesel locomotives, 1339461 Lts of HSD oil was saved during the period 01-04-2022 to 31-03-2023, which was about 32.28% more as compared to same period of previous year. The money value of HSD oil saved during this period amounted to about 15.69 crores.
- In the period 01-04-2022 to 31-03-2023, crew was provided for 105228 Train orderings over the division @ 288 crew/ day. This was 13.52% more than the crew provided during same period of previous year.
- Availability of 84.10% crew on board was ensuring during the period 01-04-2022 to 31-03-2023, against a targeted availability of 80%.
- During the period 01-04-2022 to 31-03-2023, 5020 crack trains were run by crew of Raipur division which was 42.98% more as compared to similar period of previous year.
- About 315 staff in different categories of the department have been promoted to higher grades during the period 01-04-2022 to 31-03-2023.
- During the period 01-04-2022 to 31-03-2023, about 2832 electric locomotives were attended at the trip sheds of the department with a view to ensure their fitness for train operation. Such attention was about 20.72% more as compared to previous year.