Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook View Content in Hindi
National Emblem of India

About Us

Passenger Services

News/Press Release

Recruitment

Tenders

Supplier Information

Contact Us/Other info

About Us
   Division / Workshop
      Nagpur
         Mechanical C&W
            Important Activities


 
Bookmark Mail this page Print this page
QUICK LINKS
Important Activities


IMPORTANT ACTIVITIES OF THE DEPARTMENT

1. Stationwise activities:

Gondia


Infrastructure

i.Two Pit Lines of Length 660 m and 600 m with watering facility.

ii.IOH shed/Sick Line: Covered shed of 35 x 17 x 16 Meters.

iii.Hot Axle detector machine at both UP& DN rolling in exam.points.

iv.Bio Digester Lab

v.Coach watering facility in all platforms

vi.Rolling in examination in UP & DN line.

vii.Disaster management facilities with HS-SPART, ART Class-A and 140T crane.

viii.Hand Crane for wheel changing

Activities

i.Presently, Primary Maintenance of 2 Janshatabdi Rakes.

ii.Other End Maintenance of 4 Mail/Express, 2 MEMU & DEMU Each (Pre-covid). Presently, 4 M/Exp. rakes and 01 MEMU rake.

iii.IOH of division based all PCV & OCV

iv.Disaster Management Activities including 140 Ton Crane

v.Rolling in examination of all Goods and Coaching Trains

vi.Maintenance of 3 Departmental BOBYN Rakes of the division

vii.Enroute Trouble Shooting in the beat of all Coaching and Goods Train.

viii.Mechanized Coach Cleaning in Pit Line and Platform

ix.OBHS in Jan Shatabdi Rake

x.Pest Control and AMOC of Bio Toilet in divisional PCV & OCV

             xi.Redressal of Passenger Complaint


Itwari

Infrastructure

i.Pit line of 600 meter length.

ii.Rolling in examination.

iii.Coach watering facility in all 4 platforms.

iv.Disaster management facilities with ART Class-B, and SPART.

v.Brake down truck based at MIB

Activities

i.Primary Maintenance of 01 Passenger train running between ITR-CWA (2 Rakes)

ii.Presently, Other End Maintenance of 2 M/Exp.spl,

Pre-covid  - Other End Maintenance of 2 Mail/Express, 3 Passenger and 1 MEMU rake.

iii.Disaster Management Activities in the beat.

iv.Rolling in examination of all terminating/originating Coaching Trains.

v.Enroute Trouble Shooting in the beat of all Coaching and Goods Train.

vi.Maintenance of 2 Inspection Carriages.

Chhindwara

Infrastructure

i.Coach watering facility in all 2 platforms.

ii.Rolling in examination

iii.Tool Van

Activities

i.Present, Other End Maintenance of 1 M/Exp.(Patalkot Exp.) and 1 Passenger rake running between ITR-CWA.

Pre-covid  - Other End Maintenance of 1 Mail/Express, 4 Conventional passenger train.

ii.Rolling in examination of all terminating/originating Coaching Trains.

iii.Enroute Trouble Shooting in the beat of all Coaching and Goods Train.

iv.Attend minor derailment by tool van

Nainpur

Infrastructure

i.Coach watering facility in all 2 platforms.

ii.Narrow Gauge Rail Museum.

iii.Disaster Management facility with ARME Scale –I.

              iv.Rolling in examination in all terminating & originating coaching trains. At present, all through passing coaching and Goods trains of JBP-G.

Activities

i.Other End Maintenance of 3 Conventional passenger train (Pre-covid).Presently – Nil.

ii.Rolling in examination of all terminating/originating through passing  Trains.

                  iii     Enroute Trouble Shooting in the beat of all Coaching and Goods Train.


Dongargarh

Infrastructure

                    i.Tool Van

ii.Hand Crane

iii.Wheel Impact Load Detector (WILD) is on UP line between DGG-PJB at Km No. 932/21-23.

iv.Coach watering facility in 2 platforms.

Activities

i.Attending Minor Derailments and Axle Lock of locos.

ii.Rolling in examination on requirement basis.

iii.Watering during Emergency Requirement and During Mela period.

iv.Maintenance and Upkeep of WILD

v.Sick Repair of Wagon Stock

vi.Enroute Trouble Shooting in the beat of all Coaching and Goods Train.


Tumsar Road

Infrastructure

i.Railway owned Electronic In-Motion-Weighbridge with CCTV camera.

ii.Test Rake with Standard Weights

Activities

i.Watering and Cleaning in 2 rakes running between TMR-TRDI (Pre-covid).

ii.Maintenance and Calibration of Railway Owned EIMWB

          iii.Maintenance of Test Wagons and Rake including Stamping.

           iv. Watering and Cleaning in 2 rakes running between TMR-TRDI (Presently this train service is not running due to Covid-19) 

                                                                      Bargi, Padriganj and Chiraidongri

Infrastructure

i) 01 Railway owned Electronic In-Motion-Weighbridge at above three each station provided with CCTV camera at each EIMWB.

Activity

i) Maintenance and Calibration of these Railway Owned EIMWBs.

2.0Coach and wagon holding:

i.Coach Holding:

·Passenger Coaching Vehicles (PCVs):

Type of coach

WGSCZJ

WGSCZRJ

WGACZJ

GS/ GSCZ

GSLR/ GSLRD

Total

ICF

38

6

14

18

6

82

·Other Coaching Vehicles (OCVs):

Type of coaches

RT/

TV

RT/

SV

DPC/

SV

DPC/TV

RH

RHV

RA

Total

ICF

10

3

2

2

4

1

2

24

ii.Wagon Holding (Departmental stocks):

Type of wagon

BOBYN

BCN

BRN

Total

No. of wagon

79

(3 Rakes)

5

5

89

 4.0      Disaster Management:

Station

Class of ART

Scale of ARME

ITR

‘B’ Class

3 coach HS-SPART

Gondia

‘A’ Class with Gottwald 140T BD Crane

3 coach HS-SPART

NIR

-

Scale-I

DGG

Tool Van (One Coach) containing HRE & conventional hydraulic jacks for attending minor derailment.

CWA

Tool Van (One Coach) containing HRE & conventional hydraulic jacks for attending minor derailment.

   MIB

Brake Down Mobile Truck with HRE is available at MIB for attending derailment in siding & minor yard derailment.

8.0.    Narrow Gauge Rail Museum (NGRM)

8.1.    NGRM / Nainpur

ØInaugurated on 28.11.2017 by Hon. Minister of State for Railway and opened for visitors.

ØArea 7.798 Acres (3.156 Hectare). A new two storied building constructed and two heritage buildings have been renovated.

     Main Features:-

a)Tourist train consisting of one NG loco and 3 refurbished NG coaches.

b)AC restaurant car.

c)Display of NG heritage, rolling stocks, 1 CC class loco, 3 NG coaches and 5 NG wagons.

d)Heritage machine gallery with machines of year 1880 – 1905.

e)Thematic gallery of different department.

f)AC auditorium with seating capacity of 50 persons.

g)Paintings, Posters and models of shed, locos, Signaling equipments, Bridges, workshop, depots and diesel shed.

h)Beautifully landscaped gardening with rides for children.

i)Nainpur station model etc.

ØEarnings & Average visitors per day:-

Year

Total Earning

Average footfall per day

Remark

2017-18

Rs.3,14,911/-

241

(Opened on 29.11.17)

2018-19

Rs. 4,26,830/-

131

2019-20

Rs. 4,50,405/-

134

2020-21

Rs.20,240/-

74

NGRM/NIR was closed due to COVID-19 from 23.03.20 to 5.3.21.Opened on 6.3.21 to 31.3.21 only.

2021-22

(Till July’21)

Rs.4,760/-

48

Museum was opened from 1.4.21 to 9.4.21 and closed from 10.04.21 due to Covid-19 2nd wave and presently closed for visitors.

8.2.    NGRM/Motibagh

ØInaugurated on 14.12.2002 by then MR Shri Nitish Kumar.

ØBeautifully landscaped area of about 5 acres.

ØThe main building is refurnished in 100 years old steam loco shed now having various thematic Galleries.

ØMain Features:-

a)7 thematic galleries on C&W, Loco, Electrical, Commercial, S&T, Engg. & Heritage.

b)2. Revolving Air Conditioned coaches.

c)Joy ride in Toy Train.

d)Total Rolling Stock Displayed: 22 nos.

ØEarnings & Average visitors per day:-

Year

Earning

Average foot fall /  day

Remarks

2017-18

Rs.15,67,725/-

217

2018-19

Rs.15,26,225/-

204

2019-20

Rs. 13,15,225/-

179

2020-21

Nil

NIL

NGRM/MIB closed for visitors due to COVID-19 from 17th March-2020 to 31.03.2021

2021-22

(Till July’21)

Rs. 19730

20

Museum opened on 22.06.2021 with Covid restrictions of MNC Nagpur.





Source : South East Central Railway CMS Team Last Reviewed on: 06-08-2021  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.