Achivements

 

1.ZONAL COACHING OPERATION SHIELD AWARDED FOR 2020-21.

2.Freight loading :

 

During current financial year 2021-22 (upto October) 5.209 million tonnes was achieved as compared to 4.324 million tonnes, which is an increase of 20.47 % as compared to corresponding period of last year.

 

·Loading by WCL (upto October) :

 

DKU – during the current year 451 rakes (1.850 MT) were loaded as compared to 413 rakes (1.681 MT) in the same period of last year, i.e. increase of 38 rakes (increase +0.17 MT) (+10.1 %).

SONR – during the current year 101 rakes (0.414 MT) were loaded as compared to 83 rakes (0.336 MT) in the same period of last year, i.e. increase of 18 rakes (increase +0.078 MT) (23.3%).

Rail co-efficient for Coal decreased to 47.20% as compared to 65.76% in 2020-21.

Overall there was increase of 56 coal rakes (+0.25 MT) (i.e. +12.3%).

(Total Coal loading by WCL Current year–552 rakes (1.897 MT), Last year – 496 rakes (1.657 MT) )

Efforts made by BDU to generate New traffic -

 

Food grains –

 

·PSCR/Rasmara : 45 rakes loaded. 1st rake loaded on 27.04.2021.

·Chiraidongri : 13 rakes loaded. 1st rake loaded on 21.06.2021.

Other loading highlights :

 

·Food grain loading : 479 rakes (1.026 MT) were loaded.

·Loading of Fly Ash : 218 rakes have been loaded (PMAM- 213, PJPB-5).

·Dolomite : 60 rakes loaded (CID-40, KLOD-20).

·197 mini rakes wire loaded during 2021-22 which contributed 41.1% in Total food grain loading.

·1st BTAP rake loaded ex. PMAM siding under LWIS scheme (Owner BCRL M/s Birla Corporation Ltd) for destination RCPB (M/s Reliance Cement Co. Pvt. Ltd, Badanpur JBP/WCR) on 25/06/2021. (30 rakes loaded upto Oct’21).

·1st rake under STS scheme loaded ex.KLOD for destination IISD on 09/10/2021, Commodity-Dolomite, 59 BOXNHL by M/s Murlidhar Minerals, earning Rs.53,28,982/-.


 

 

3.Mobility :

·Highest no. of goods trains taken over ex.Raipur on 02/10/2021 – 60 trains, previous best 59 trains on 08/03/2021.

·During Aug’21, 2 loaded long haul trains with WAG9 single locos run successfully in UP direction without bankers :

-17/08/2021 : N/TSWS (33225 BIA) + N/TSWS (31123 LGD).

-30/08/2021 : N/AEMD (32817 LGD) + N/TSWS (27058 DDU).

·During Aug’21, 1 loaded long haul trains with WAG5 multi locos run successfully in UP direction without banker:

-13/08/2021 : N/KRDS (24039/23164 JHS) + N/TSWS (23613/23329 ET).

·Number of bankers stationed at Dongargarh reduced to 3 as compared to 7 bankers which were being previously used.

4.Coaching train operations :

·Overall punctuality of coaching train 94.07 % as compared to target of 85.0 %, i.e. improvement of 10.7%.

·Datalogger linked with COA commissioned on 15.08.2021 at Gondia.

·Oxygen/Spl : 1st Oxygen/spl ex.KLMG to VSPS passed through on 21/04/2021. Total 84 Oxygen/Spl were passed through during 2021-2022 till date.

 

5.Improvement in Infrastructure :

 

·Auto signaling :

-DGG-JTR-MUA commissioned on 11/04/2021.

-BAKL-RJN commissioned on 27/08/2021.

-MUA-BAKL commissioned on 29/08/2021.

 

·Bortalao 3rd Line :- NIfor Commissioning of 3rd Line alongwith Auto Signalling05/07/21 8.45 hrs.to 07.07.212.30 hrs. Total 46.45 hrs. CRS inspection done on 22/07/2021, sanctioned received 26/07/2021.

·Darekasa 3rd Line :- NIfor Commissioning of 3rd Line Alongwith Auto Signaling, 8.7.218.20 hrs to 09.07.21 19.10 hrs. (34.50 hrs). CRS inspection done on 22/07/2021, sanctioned received 26/07/2021.

·CRS Inspection of Railway Electrification work between BTC-KGE, KGE-TRDI conducted on 09/07/2021.

·New Crew Lobby Kalumna (KAV) defined in CMS on 06/08/2021.

·Commissioning of new goods line at Chiraidongri :New Goods line (L.no.3) commissioned and open for goods loading vide RC.no.205(G)/2021 dtd.09/09/2021.

·Commissioning of new goods line at Garha :- New Goods line commissioned dtd.01/11/2021.

- * -




Source : South East Central Railway CMS Team Last Reviewed : 14-12-2021  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.