Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook View Content in Hindi
National Emblem of India

About Us

Passenger Services

News/Press Release

Recruitment

Tenders

Supplier Information

Contact Us/Other info

About Us
   Division / Workshop
      Raipur
         Achievements


 
Bookmark Mail this page Print this page
QUICK LINKS
Achievements


मई-21 के दौरान अति महत्वपूर्ण उप्लब्धिया:

Very important happening during May- 2021:

A.उपलब्धिया
Achievements: -
1.PP Yard Bhilai: 

1.1 In the month of May -21, ROH of total 521 wagons attended against the target of 700. Out of which, PPYd attended 482 wagons, Ex.Yd/BIA attended 39 wagons.

1.2 At PP Yard Bhilai, in the month of May -21, total warranty claimed is Rs. 636622/- and total value of material

realized is Rs.240070/-.

1.3 24 nos. of BOBRN CC rakes & 12 Nos. of BOBRN PEE rakes were examined at Coal Empty Yard in the month of May-2021.

1.4 On train repair of 1324 Nos. of wagon done during rake examination in the month of May.-2021.

1.5 Total 11 CC Rakes (Off-POH-0, C-fit-5 & newly built HL-04 & New built BOBRN-02) formed in the month of May-21. Total 187 CC rakes are running as on date, out of which 53 nos. of twin pipe Pragati, 29 nos. BOBRN and 11 nos.  of  BOXNS twin pipe CC rakes.

2.Coaching Depot Durg :

2.1 Various schedules and lifting done during the month May-21 are given below:


IOH

Ext. IOH

Ext. POH

SS-1

Ext. SS-1

Ext. SS-2

May-21

03

0

4

14

0

0

Cumulative

04

0

6

25

0

0

           2.2 Total 31 coaches PH test and total 44 coaches COD test have been done in Bio-effluent testing lab in this month.

3.Exchange Yard Bhilai :

3.1 ROH outturn of 39 wagons attended during this month. 

3.2 Total 78 Nos. Bogie Repaired in the month of May- 2021.Commulitive is 180.

4. Reception Yard BMY:

4.1. M/s BWT Ltd attended 14 wagons rehabilitation of BOXN wagons to BOXNR in the month of May-21 and Cumulative is 429. 

5.Total 336 wagons (PPYd-198, R-Yd/BMY-55 & Ex-Yd/BIA-83) have been converted into twin pipe in the month of May-21. Cumulative is 11034 wagons.

6.81 Super Long Haul rake formation done in the month of May-21.

7.Total 859 Rakes examined in Raipur Division in the month of May-21.  

2प्रमुखउपलब्धियां  मार्च -2021 के  दौरान.

Major achievements During May-2021.
2.1    पीपी यार्ड, भिलाई में कुल 11 बॉक्सेन (0-ऑफ पीओएच, 05-सी-फीट, नई बिल्ड एचएल -04 और बॉक्सआर-02)
         सीसी रेक तैयार किए गए है  
        Total 11 BOXN (00 OFF POH, 05 C-Fit, New built HL -04 & BOBRN-02) CC rakes were formed at PPYard, Bhilai. 
2.2   आरओएच डेपो / पीपी यार्ड ने1142 (482 आरओएच + 532 सिक मरम्मत +128 अलादनीय) वैगनों का आउटपुट दिया है
         ROH Depot/PP Yard has given an outturn of  1142 (482 ROH + 532 Sick repair +128 unloadable) wagons.
2.3    एनपीओएच मरम्मत के लिए286 वैगनों में भाग लिया गया है
         286 wagons have been attended for NPOH repairs.
2.4  81 सुपर लॉन्ग हौल ट्रेनों का गठन किया गया था| 
          81  nos. super long haul trains had been formed.
3.स्क्रैप डिस्पोजल 

Scrap Disposal

Scrap

Target for year       (2021-22)

Target per month

Scrap Disposal

Up to May-21

Cumulative 

Coach

Wagons

(Ferrous & STB)

Ferrous

10000 MT

833.333 MT

-

-

1231.500 MT

1554.830 MT

STB

500 MT

41.667 MT

-

-

20.950 MT

23.530 MT

Wagons

630

52

-

0

-

0

Coach

BG

10

0.8

-

-

-

-

NG

-

-

-

-




Source : South East Central Railway CMS Team Last Reviewed on: 10-06-2021  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.