            About


 
Bookmark Mail this page Print this page
QUICK LINKS
About

1)   

1)About:

By improving the reliability of available assets, the productivity can be increased with the available resources. In this direction action plan of the department is as under:

 

1.Replacement of AL Catenary wire by Cu-Cad Catenary wire.
2.Elimination of critical implantation locations from Main Line in DUG-NGP section.
3.Rectification of leaning Masts having leaning more than 21 cms. from DUG-NGP Main line section.
4.Upgradation of 3rd bay in balance four TSSs i.e. Amgaon, Kachewani,Bhandara and Kanhan in connection with DUG-KAV 3rd line work.
5.Creation of Posts for the maintenance of newly electrified sections and section/sdings under electrification.

1.MANPOWER

(A)PostS UNDER TRD CONTROL

 

Category

Sanction

Actual on Roll

Vacancy

Gazetted(Group –A)

 

 

 

JA Grade/S G

1

1

0

Sr. Scale

0

0

0

Total

1

1

0

Gazetted(Group –B)

 

 

 

Jr. Scale

3

3

0

Total

3

3

0

Non-Gazetted (Group –C)

 

 

 

SSE

38

32

6

JE

19

15

4

Ministerial

14

14

0

Artisan

149

137

12

Total

220

198

22

Non-Gazetted (Group-D)

154

159

-5

Grand Total (Gr.-C+Gr.-D)

374

357

17

 

(B)POST UNDER CONTROL OF OTHER DEPARTMENTS

 

Category

Sanction

Actual on Roll

Vacancy

Non-Gazetted (Group –C)

 

 

 

Tower Wagon Drivers (Under Elect./OP Deptt.)

38

23

15

MV/MDM Drivers (Under Mechanical Deptt.)

5

5

0

Peon/TADK (Under Personnel Deptt.)

6

5

1

CA (Under Personnel Deptt.)

1

0

1

Total

50

33

17

 

2.ELECTRIFIED SECTION OVER NGP DIVN.:

Total RKM

1180 RKM

Total TKM

1976 TKM

Sidings

217.877 TKM

 

 

 

 

 

 

2.1DETAILS OF ELECTRIFIED SECTION:

(I) DURG-NAGPUR SECTION (Including KNHN-RTK, KAV-KPKD & KAV-KRD Section)

 

TotalRKM

342.54 RKM

Main line ( DURG –NGP )

Brach Line (KNHN-RTK)

756.520 TKM

Sidings

149.480 TKM

Total TKM

906 .00 TKM

 

(II) GONDIA-CHANDAFORT SECTION

 

TotalRKM

239.50 RKM

TotalTKM

255.00 TKM

 

 

 

(III) GONDIA-JABALPUR SECTION

 

TotalRKM

231.04RKM

TotalTKM

267.77TKM

Sidings

14.23

Total

282.00 TKM

 

(IV)ITWARI-CHHINDWARA SECTION:

TotalRKM

145.505RKM

TotalTKM (ITR-CWA)

183.50TKM

Siding

23.50 TKM

Total

207.00 TKM

 

(V)MFR-NIR-CWA SECTION:

 

Total RKM (MFR-NIR,NIR-PUE, CWA-CHUA, PUE-BVA)

41.75RKM, 33.02 RKM,

35.82 RKM, 20.47 RKM

TotalTKM (MFR-NIR)

45.00TKM

TotalTKM (NIR-PUE)

38.50TKM

TotalTKM (CWA-CHUA)

35.00TKM

Total TKM (PUE-BHV)

21.82 TKM

Under Progress (BHV-CHUA)

59.68 TKM

Total

200.00 TKM

 

(VI)TMR-TRDI-KGE-BTCSECTION:

Total RKM

110.85RKM

TotalTKM (TMR-TRDI)

49.60TKM

TotalTKM (KGE-BTC)

48.50 TKM

TotalTKM (TRDI-KGE)

19.00 TKM

Sidings

9.00 TKM

Total

126.10 TKM Say 126 TKM

 

 

 

 

(VII)DUG-KAV 3rd LineSECTION:

 

TKM (DUG-DGG)

72.415TKM

BTL-DKS

11.085 TKM

DGG-PJB

7.745 TKM

TMR-BRD

22.179 TKM

Balance

113.424 TKM

Total

274.00 TKM

 

(VIII)ITR-NAB LineSECTION:

 

Under Progress (ITR-NAB)

104.905RKM

Under Progress (DGG-KAV)

128.0TKM

 


2.2 ELECTRIFIED SIDINGS:

 

Sr No

Taking off station

Siding Name

TKM

1

Rasmara

M/s. Crest Steel & Power Ltd.

2.53

2

Murhipar

M/s. HEG (Steel plant) siding

2.56

3

Rajnandgaon

M/s. FCI siding

4.04

4

Kachewani

M/s. APML Siding

23.422

5

Bhandara Road

M/s. Sunflag siding

3.22

6

Chacher

M/s. NTPC siding with In plant Yard

34.60

7

Chacher

M/s. UTCL siding

6.96

8

Kalumna

Khaperkheda siding

32.51

9

Kalumna

Koradi siding

28.769

10

Kanhan

Dumrikhurd siding

1.20

11

Binaiki

M/s. JPL Siding

7.10

12

Tirodi

South siding

1.114

13

Goberwahi

Sitasaongi Siding

4.59

14

Khaperkheda

Soaner Coal Siding, CWA-KVA

25.07

15

Tirodi

Jamrapani Siding

2.120

16

Dongaribuzurg

DGBZ MOIL Siding

1.259

17

Balaghat

Bharvelly (MOIL) Siding

6.397

18

Kanhan

Rita Steel Siding

5.324

 

2.3 STATUS OF UN-ELECTRIFIED SIDINGS :

SN

Section/Siding

Serving Station

Executing Agency

Total Length in TKM

TDC

Remarks

1

Mansar MOIL Siding (Dutta Pahar)

Ramtek

Elect. (Con)/BSP

3.20

Dec’22

Work awarded to M/s. Joy Electricals & Engg. Works, Sagar (MP) on dt. 24.11.2021,

(90% Work completed).

2

Kandri MOIL (Kodan Pahar) Siding

Ramtek

Elect. (Con)/BSP

1.50

Dec’22

-Do-

 

2.4 TRD INSTALLATIONS:

 

S. N.

Post

Station
Qty.

1.

Traction Sub Stations (TSS)

DUG-NGP Main Line: Kanhan, Bhandara Road, Amgaon, Kachewani, Paniajob, Rajnandgaon,

6 nos.

G-BPQ Line: Nagbhir, Mulmarora, Hirdamali (Back Charged)

3 Nos.

G-JBP Line: Nainpur, Ghansore, Samnapur

3 Nos.

CWA-ITR Line: Sausar, Linga,Patansaongi

3 Nos.

MFR-NIR-CWA: Mandlafort, Chaurai, Bhoma

3 Nos.

TOTAL

18 Nos.

2.

Switching Control Posts (SSP)

DUG-NGP Main Line: Kalumna, Kamptee, Chacher, Khat, Koka, Tirora, Kachewani (APML), Gangajhiri, Gudma, Dhanoli, Bortalao, Dongargarh, Bakal, Parmalkasa,

14 Nos.

G-BPQ Line: Rajoli, Gongalee, Brahmapuri,Wadegaon, Dewalgaon, Talodi Road

6 Nos.

G-JBP Line:,Garha, Bargi, Shikara, Binaiki, Nidhani, Padarigan, Nagarwara, Charegaon, Balaghat, Hatta Road, Birsola,

11 Nos.

CWA-ITR Line:Khaprikheda, Saoner, Lodikheda, , Ramakona, Bhimalgondi, Umaranala,

6 Nos.

TMR-TRDI Line: Mitewani, Dongaribuzurg, Mahkepar

3 Nos.

CWA-NIR-MFR: Chiraidongari, Jhilmili, Chhindwara, Palari

4 Nos.

BTC-KGE: Balghat, Waraseoni, Kochewahi

3 Nos.

TOTAL

47 Nos.

3.

Switching Control Posts (SP)

DUG-NGP Main Line: Itwari, Tharsa, Tumsar, Salekasa, Musra, Rasmara, Gondia-1,

7 Nos.

G-BPQ Line: Gondia-2, Sondad, Chandafort, Sindewahi,

4 Nos.

G-JBP Line: Kachhpura, Nagradham, Sukari Mangela, Jeonara, Lamta

5 Nos.

CWA-ITR Line:Kalumna, Kelod, Bhandarkund.

3 Nos.

TMR-TRDI Line: Tumsar town, Tirodi

2 Nos.

CWA-NIR-MFR: Jamgaon, Ghatparasia

2 Nos.

BTC-KGE: Balaghat

1 No.

TOTAL

24 Nos.

4

Tower Wagon 8 wheeler

T/Car No.6503 (DHTC, BEML) & 6533 (DETC, ICF), 191098 (DETC, ICF), 191038 (DETC, ICF), 8W-190095 (DETC, ICF), 200082 (DETC, ICF), 8W-943003 (DETC, BEML), 8W-943011 (DETC, BEML), 8W-943019 (DETC, BEML), 8W-943020 (DETC, BEML)

10 Nos.

5

Tower Wagon 4 wheeler

T/Wagon No. 6031, 6039 (Mark-II) and PTL-0030 & PTL-0031(Type-OHE-IV)

4 Nos.

 

2.5 MAINTENANCE DEPOTS:

S. N.

Depot

Post/Station

Qty.

1.

OHE Depots

DUG-NGP Main Line: Dongargarh, Gondia, Tumsar, Kalumna,

4 Nos.

2.

PSI Depots

DUG-NGP Main Line: Dongargarh, Gondia, Kalumna,

3 Nos.

TMR-TRDI: Tumsar (Under Construction)

1 No.

TOTAL

4 Nos.

3.

OHE & PSI Combined Depot

G-BPQ Line: Sondad, Nagbhir, Mulmarora Partially functioning), Wadsa (Not functioning),

4 Nos.

G-JBP Line: Gwarighat, Nainpur, Balaghat (Partially functioning)

3 Nos.

CWA-ITR Line: Chhindwara, Sausar (Partially functioning)

2 Nos.

CWA-NIR-MFR: Seoni & Mandlafort(Under Construction)

2 Nos.

TOTAL

11 Nos.

3.

RC Depot

Nagpur

1 No.

4.

Remote Control Center

Nagpur

1 No.

5.

RRD Depot

Dongargarh & Nainpur (Under Construction).

2 Nos.




Source : South East Central Railway CMS Team Last Reviewed : 26-12-2022  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.