Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook View Content in Hindi
National Emblem of India

About Us

Passenger & Freight Services

Recruitment/News/Press Release

General Public Info.

Dept./Div of SECR

Tender Related

Contact Us/Other info.



 
Bookmark Mail this page Print this page
QUICK LINKS
Activities & Achievements

List of Approved Consultants

Notice inviting application for Empanelment/ Registration of consultants to undertake private siding works over South East Central Railway

Form for empanelment(FFE) document no. SECR/HQ/Engg/FFE-1 of 2023 for empanelment/Registration of Private siding works of  consultants


ACHIEVEMENTS

1.1.1Track Works : -

S.N.

Item

Unit

Target

Prop. Target upto Jun'20

Progress upto
Jun'20

% Prog w.r.t. Prop. Target


1

CTR

Unit

140

35.00

33.48

96%


2

TRR(P)

TKm

65

16.25

43.95

270%


3

TTR

Weighted Nos.

110

27.50

53.25

194%


4

TFR

TKm

194

48.50

47.71

98%


5

TWR by MFBW

TKm

75

18.75

17.63

94%


6

Ballast Supply

Thou. Cum.

270

67.50

90.88

135%


7

Deep Screening (Plain Track)

Km.

320

80

107.73

135%


8

Plain Track Tamping

Km

5850

1462.50

2333.47

160%


9

Turn out Tamping

Nos.

3000

750

1641

219%


10

Formation Treatment

Km

20

5.00

12.14

243%


11

Scrap Disposal

MT

8000

2000

4709.77

235%


12

USFD Testing

Tr Km

22030

5507.50

6596.2

120%



13

Removal of DFW (R)

Nos.

4400

1100

1506

137%


14

Introduction of 30 KMPH speed o­n Turnouts.

Route Kms.

115.8

28.95

46

159%


15

Shoulder Ballast Cleaning

Km.

390

97.50

120.23

123%


1.1.2MGNREGA Works in SECR:

Rs in lakhs

Nos. of identified work

Nos. of works sanctioned

Nos. of works in progress

Nos. of work completed

No.

Cost

No.

Cost

No.

Cost

No.

Cost

53

624.43

37

588.168

11

97.644

11

381.64

a.Bilaspur Division: 05 nos. new works have been sanctioned during the month (UMR 04 new works sanction for cess repair and Jungle cleaning and 01 no for paver block fixing at Manendragarh. The works are in progress.

b.Raipur division:  02 new works sanctioned for protection of existing railway embankment in Durg-Dallirajara section.

1.1.3During the month of June’2020, 78.8% of track machines have worked in SECR making it o­ne of the best performing Zone of Indian Railways. With prompt attention of breakdowns & daily maintenance, machines are kept in working order during this challenging & difficult period of Lock down.

1.1.4POH of Machines DGS-420 has been completed during the month at IOH Depot Nagpur.

1.1.5Layout Correction/Conversion with T-28:

a.In 05 Yards (DLT, NGE, BRH, KTO & SJQ), 8 Nos. turnouts of 1 in 8.5 have been converted to 1 in 12 by T-28 Machine in ADEN/ Manendragarh section of Bilaspur division.

b.At Nipania station of Raipur Division,layout correction for 02 nos. of turnouts has been carried-out by T-28 Machine during the month.

c.During the month 1 No. layout correction along with deep screening by T-28 machine has been done at BMP yard point No. 41A. Further  9 Nos. manual deep screening of Turnouts (BRA 21B, 22B, TUD 31A, 31B, 41A, AWH X1, 31B, 41A GNL 41B ) has been completed. Cumulative progress of deep screening of Turnouts by T-28 &manual  has gone up to 1 No. & 11 Nos. respectively.

1.1.6Regular sanitization of Track Machines, Track Machine office, camping coaches, Zonal Base Depot Nagpur & Satellite Depot Bilaspur have been done during this month to ensure safety against COVID-19.

1.1.7The following Track Machines have surpassed monthly targets as below:

Sl. No.

Machine

Unit

R.B. Monthly proportionate target

Progress for June’20

1

BCM

Kms.

30.33

37.59

3

SBCM

Kms.

27.50

43.95

4

WST

Kms.

235

379.07

6

UNIMAT

Eq.T/O

250

461

7

MPT

Kms.

67.50

67.90

8

DGS

Kms.

183.58

194.48

9

UTV

Pcs.

10679

21825

11

HOT-CSM

Kms.

135

144.47

1.1.8Long continuing temporary speed restriction (since 04.07.2018) of 100 kmph, o­n account of DFWR, in  Kelzer – Chandafort (26.26 km)  has been normalised to110 kmph  by renewal of  344 Nos. defective welds.

1.1.9Application for speed raising of Anuppur - Shahdol DN line from 100 Kmph to 110 Kmph has been sent to CRS through E-mail, as IR-CRS program is not working.

1.1.1002 Nos. MLC o­n BG i.e. (i) LC No. BK-36 in Bilaspur division and (ii) LC No. 566 in Nagpur division have been eliminated during this month. Cumulative 02 Nos. of MLCs o­n BG have been eliminated in 2020-21.

1.1.11Launching of Boxes for LHS has been completed at 6 nos LCs, during this month (manned LC No. BK-17, BK-44, BK-54, BK-55, BK-58 & BK-60 between Bilaspur –Anuppur section of Bilaspur division).

1.1.12Side pathway has been provided at Br.No: 54 DN (5x18.30m PSC Girder) between Baraduar-Champa stations o­n Jharsuguda-Champa section of Bilaspur Division. This work provided a safe passage to pedestrians including Railway staff.

1.1.13Metalizing of plate girders and floor system of open web girders have been completed at Br.No: 157k DN (2x18.30m PG+2x45.70m OWG) located between Birsinghpur- Nowrozabad stations in Bilaspur division.

1.1.14Metalizing of plate girders have been completed at Br.No: 91k DN (7x18.30m PG) located between Chhulha- Anuppur stations in Bilaspur division.

1.1.15Greasing of bearings of 06 Nos. bridges i.e. Br. No. 29 UP & DN, 9TT, 33 DN, 41 UP & DN in Nagpur division have been completed during the month.


2.0IMPORTANT PASSENGER and STAFF AMENITY WORKS COMPLETED DURING THE MONTH:


2.1.1Foot Over Bridge at Ghutku station completed & commissioned.

2.1.2Launching of Girders for Foot Over Bridge at Harri&Venkatnagar stations done by RITES.

2.1.3Extension of platform (Extended 128 Mts) at Lorha station completed.

2.1.4Old pump replaced at Khongsara station by new pump (capacity 40 HP) for uninterrupted water supply at State & Rly colony.


3.0SYSTEM IMPROVEMENTS: -



3.1Up-gradation of road surface at 17 LCs and overhauling of 33 level crossings has been carried out for improvement of safety. Cumulative up-gradation of road surface at 52 nos. and overhauling of 107 nos. level crossings has been done during the year 2020-21.

3.2RAIL/WELD FAILURES:

3.2.1The Rail and weld failures during the year in comparison to previous year are as detailed below:

(As per TMS)

Description

During the year 20-21

During the year 19-20

For the month

CumulativeUptoJun’20

For the month

CumulativeUptoJun’19

Rail Fractures

05

13

06

10

Weld Failures

03

06

10

17

Total

08

19

16

27


4.0ACCIDENTS o­n ENGINEERING ACCOUNT (BOARD CASES o­nLY):

Total Accidents

Accidents o­n Engineering account

2020-21

2019-20

2020-21

2019-20

During the month

Cumulative

During the month

Cumulative

During the month

Cumulative

During the month

Cumulative

0

0

0

0

0

0

0

0






Source : South East Central Railway CMS Team Last Reviewed : 25-05-2023  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.