            Activities & Achievements


 
Bookmark Mail this page Print this page
QUICK LINKS
Activities & Achievements


IMPORTANT ACTIVITIES OF 2023-2024 

     



Achievement and Highlights of S&T department, NGP Division for the month of
                                                              July,2023
    

1.Yard modification in connection with 3rd line work has been done at Gudma station (72 routes) in Nagpur-Durg section commissioned on 18.07.2022 by            construction/NGP unit for provision of Electronic interlocking (EI) of M/s Hitachi make with Distributed architecture, hot standby, Dual VDU arrangement, MACLS arrangement, standard II R interlocking, complete  track circuiting, IPS, Data logger, UFSBI, Fire alarm, ELD & Fuse Alarm system. S&T/Open line was actively involved and extended all the assistance required during every stages of this work.
2.Yard modification in connection with 3rd line work has been done at Kamptee station  (86 routes) in Nagpur-Durg section commissioned on 25.07.2022 by construction/NGP unit for provision of Electronic interlocking (EI) of M/s Hitachi make with Distributed architecture, hot standby, Dual VDU arrangement, MACLS arrangement, standard II R interlocking, complete  track circuiting, IPS, Data logger, UFSBI, Fire alarm, ELD & Fuse Alarm system. S&T/Open line was actively involved and extended all the assistance required during every stages of this work.

3.System integrity testing have been done at following stations in the month of July’23: -

S.N.

Station

Date of Completion

1

Mulmarora

08.07.23

2.

Gudma

16.07.23

3.

Kamptee

24.07.2022

 

4.To improve reliability of point operation, old worn-out point machines has been replaced at following station in July’2023:

 

S.N

Station

Pt.

Date of Replacement

1

Birsola

22B

06.07.23

2

Chacher

57A

15.07.23

 

 

 

5.Wornout Ground connection have been replaced at following stations in the month of July’23:

S.N

Station

Pt. No.

Date of Replacement

1

Birsola

22B

06.07.23

2

Amgaon

41A

16.07.23

3

Rewral

151A

26.07.23

 

 

 

6.Wornout Tongue rail have been replaced in coordination with Engg. Department at following stations

in the month of July’2023

S.N

Station

Pt. No.

Date of Replacement

1

Amgaon

41A

16.07.23

2

Gondia

113A

02.07.23

3

Gondia

419A

16.07.23

4

Gudma

32A

03.07.23

5

Bortalao

103A

04.07.23

6

Bortalao

153A

16.07.23

7

Kachewani

113A

10.07.23

8

Jatkanhar

43B

14.07.23

9

Dongargarh

110A

15.07.23

10

Gangajhiri

103A

16.07.23

11

Tumsar Road

104A

16.07.23

12

Rewral

151A

26.07.23

13

Parmalkasa

33B

30.07.23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.Wornout Point JB have been replaced at following stations in the month of July’23:

S.N

Station

Pt. No.

Date of Replacement

1

Birsola

22B

06.07.23

2

Bhandara

177B

07.07.23

3

Gudma

152BT

25.07.23

4

 

 

 

 

 

 

 

8.Automatic Fire detection and Alarm system with Datalogger connectivity has been installed at

Samnapur station on 20.07.2023.

 

9.For improving reliability of track circuit, 31 nos. (As on 31.07.2023) of glued joints have been replaced in

association with Engg. Department in the month of July’2023.

 

10.Secondary cells have been replaced with new cells at the following stations in the month of

July23:

 

SN

Station

Nos. of batteries

Capacity

1

Samnapur

03

80AH

2

Kamptee

492

200AH

3

Gudma

432

200 AH

 

Total

927

 

 

 

 

 

11.The New Internet /Railnet connectivity have been provided at following location in the month of July’2023.

i) Operating office/NGP -2 nos.

ii) Personnel/NGP-1 no.

 

12.The new voice logger LC Gate telephone have been installed in following non-interlocked LC gates of NGPDivision forthe month of July,2023.

i)LC gate no 68 (in between PTS-KPKD)     

 

13.The OFC equipment along with all accessories & back up power supply arrangements have been shifted fromold OFC hut to new building OFC Hut at GDM on 13.07.2023.