About

1)   

1)1)About:

By improving the reliability of available assets, the productivity can be increased with the available resources. In this direction action plan of the department is as under:
1.Replacement of AL Catenary wire by Cu-Cad Catenary wire.
2.Elimination of critical implantation locations from Main Line in DUG-NGP section.
3.Rectification of leaning Masts having leaning more than 15 cms. from DUG-NGP Main line section.
4.Upgradation of 3rd bay in balance four TSSs i.e. Amgaon, and Kanhan in connection with DUG-KAV 3rd line work.
5.Creation of Posts for the maintenance of newly electrified sections and section/sdings under electrification.

1.MANPOWER

(A) PostS UNDER TRD CONTROL

Category

Sanction

Actual on Roll

Vacancy

Gazetted  (Group –A)

JA Grade/S G

1

1

0

Sr. Scale

1

1

0

Total

2

2

0

Gazetted  (Group –A/B)

Jr. Scale

2

2

0

Total

2

2

0

Non-Gazetted (Group –C)

SSE

38

30

8

JE

19

21

-2

Ministerial

13

14

-1

Artisan

149

135

14

Total

219

200

19

Non-Gazetted (Group-D)

148

140

8

Grand Total (Gr.-C+Gr.-D)

367

340

27

(B) POST UNDER CONTROL OF OTHER DEPARTMENTS

Category

Sanction

Actual on Roll

Vacancy

Non-Gazetted (Group –C)

Tower Wagon Drivers (Under Elect./OP Deptt.)

38

25

13

MV/MDM Drivers (Under Mechanical Deptt.)

5

5

0

Peon/TADK (Under Personnel Deptt.)

6

5

1

CA (Under Personnel Deptt.)

1

0

1

Total

50

35

15

2.0 ELECTRIFIED SECTION OVER NGP DIVN.:

 

Total RKM

1228.80 RKM

Total TKM

2167.70 TKM

Sidings

192.785 TKM

        2.1  DETAILS OF ELECTRIFIED SECTION:

           

(I) DURG-NAGPUR SECTION (Including KNHN-RTK, KAV-KPKD & KAV-KRD Section)

Total RKM

342.54 RKM

Main line ( DURG –NGP )

Brach Line (KNHN-RTK)

756.520 TKM

Sidings

149.480 TKM

Total TKM

906 .00 TKM

 (II) GONDIA-CHANDAFORT SECTION (Comm. – March’2018 by RE/SC)

Total RKM

239.50 RKM

Total  TKM

255.00 TKM

(III) GONDIA-JABALPUR SECTION   (Comm. – Oct’2020 by RE/JBP)

Total RKM

231.04  RKM

Total  TKM

273.60  TKM

Sidings

6.40 TKM

Total

280.00 TKM

(IV) ITWARI-CHHINDWARA SECTION:  (Comm. – Aug’2020 by RVNL))

Total RKM

145.505  RKM

Total  TKM (ITR-CWA)

182.00TKM

Siding

25.00 TKM

Total

207.00 TKM

(V) MFR-NIR-CWA SECTION:  (Comm. – Feb’2023 by PGCIL)

Total RKM

183 RKM

Total  TKM (MFR-NIR)

45.00  TKM

Total  TKM (NIR-PUE)

38.50  TKM

Total  TKM (CWA-CHUA)

35.00  TKM

Total TKM (PUE-BHV)

21.82 TKM

Total TKM (BHV-SEY)

16.20 TKM

Total TKM (SEY-CHUA)

43.48 TKM

Total

200.00 TKM

(VI) TMR-TRDI-KGE-BTC  SECTION: ( Comm. – Jul’2021 by RE/SC & Elect/Construction)

Total RKM

110.85  RKM

Total  TKM (TMR-TRDI)

49.60  TKM

Total  TKM (KGE-BTC)

48.50 TKM

Total  TKM (TRDI-KGE)

19.00 TKM

Sidings

9.00 TKM

Total

126.10 TKM Say 126 TKM

(VII) DUG-KAV 3rd Line  SECTION:

Total Scope

280 TKM

Total  TKM  (DUG-RJN)

30.45 TKM

Total  TKM  (DGG-RJN)

41.965 TKM

Total  TKM (BTL-DKS)

11.085 TKM

Total  TKM (DGG-PJB)

7.745 TKM

Total TKM (KWN-GJ)

7.624 TKM

Total  TKM (TMR-KWN)

35.311 TKM

Total  TKM (TMR-BRD)

22.179 TKM

Total  TKM (BRD-TAR)

31.669 TKM

Total TKM (TAR-SAL)

11.360 TKM

Total Commissioned

199.388

Balance (DGG-BTL, DKS-G-KWN, SAL-KAV)

80.612 TKM

(VIII)ITR-NAB Line SECTION:   (Executing Agency – MRIDC, TDC – 03/2024)

Scope of Work (ITR-NAB)

104.905  RKM, 128.00 TKM

Commissioning during 2023-24

65 RKM, 70 TKM

Umred/TSS

1 no.

SP

2 nos.

SSP

6 nos.

2.2 ELECTRIFIED SIDINGS:

Sr No

Taking off station

Siding Name

TKM

1

Rasmara

M/s. Crest Steel & Power Ltd.

2.53

2

Murhipar

M/s. HEG (Steel plant) siding

2.56

3

Rajnandgaon

M/s. FCI siding

4.04

4

Kachewani

M/s. APML Siding

23.422

5

Bhandara Road

M/s. Sunflag siding

3.22

6

Chacher

M/s. NTPC siding with In plant Yard

34.60

7

Chacher

M/s. UTCL siding

6.96

8

Kalumna

Khaperkheda siding

32.51

9

Kalumna

Koradi siding

28.769

10

Kanhan

Dumrikhurd siding

1.20

11

Binaiki

M/s. JPL Siding

7.10

12

Tirodi

South siding

1.114

13

Goberwahi

Sitasaongi Siding

4.59

14

Khaperkheda

Soaner Coal Siding, CWA-KVA

25.07

15

Tirodi

Jamrapani Siding

2.120

16

Dongaribuzurg

DGBZ MOIL Siding

1.259

17

Balaghat

Bharvelly (MOIL) Siding

6.397

18

Kanhan

Rita Steel Siding

5.324

Total

192.785

2.3 STATUS OF UN-ELECTRIFIED SIDINGS :

SN

Section/Siding

Serving Station

Executing Agency

Total Length in TKM

TDC

Remarks

1

Kandri MOIL (Kodan Pahar) Siding

Ramtek

Elect. (Con)/BSP

1.50

Jul’23

0.5 TKM, OHE wiring balance due to Height Gauge of LC Gate on NH-44.

2.4 PSI INSTALLATIONS:

(i) Traction Sub Station:

SN

TSS

CD

in

MVA

Nos of X-mer

Rly Identity no.

Rating of Transformer

Make

Mfg. Date

DOC

Last POH

Feeding Zone

PTFE N/S

Remarks

A)     DUG-NGP Main line

1

RJN TSS

18

3 Nos.

TR-1

13.5/20 MVA

MINEL

1988

18.09.1992

Done in 2018-19

--

Yes

Normally Tr-2 & Tr-21 are in load & Tr-1 is kept standby

TR-2

13.5/20 MVA

MINEL

1988

14.02.1992

Due

24 kms

Tr-21

21.6/30.24 MVA

TELK (KERALA)

2017

30.08.2017

New

20 kms.

2

PJB TSS

24.5

3 Nos.

TR-3

13.5/20 MVA

MINEL

1988

26.12.1990

Done in 2018-19

--

Yes

Normally Tr-4 & Tr-30 are in load & Tr-3 is kept standby

Tr-4

21.6/30.24 MVA

CGL

2021

04.04.2022

New

23 kms.

Tr-30

21.6/30.24 MVA

Vishvsas

2018

30.08.2018

New

21 kms.

3

AGN TSS

Open Access

3 Nos.

Tr-5

13.5/20 MVA

MINEL

1988

05.02.1994

Due

21 kms.

Yes

Both Transformers are in load and feed in opposite ends.

Tr-6

13.5/20 MVA

MINEL

1988

26.03.1993

Due

18 kms.

Tr-31

13.5/20 MVA

CGL

2021

Under commissioning

--

--

4

KWN TSS

Open Access

3 Nos.

Tr-7

13.5/20 MVA

MINEL

1988

26.08.1991

Done in 2018-19

--

Yes

Normally Tr-8 & Tr-32 are in load & Tr-7 is kept standby. (21.6/30.24 MVA, CGL make Transformer (Tr-08) available for replacement by Elect./Con.

Tr-8

13.5/20 MVA

MINEL

1988

31.03.1991

Due

24 kms

Tr-32

21.6/30.24 MVA

CGL

2021

13.11.2022

New

26 kms.

5

BRD TSS

Open Access

2 Nos.

Tr-9

20 MVA

ABB

1989

03.12.1991

Done in 2018-19

(17 KMs. HWH End & 25 Kms. NGP End)

Yes

Both Transformers are alternatively given on load

Tr-10

20 MVA

ABB

1989

05.10.1991

Done in 2018-19

6

KNHN TSS

Open Access

3 Nos.

Tr-11

21.6/30.24 MVA

BHEL

2019

12.01.2021

New

(21 Kms. HWH End & 18 Kms. NGP End)

No (O/L type Neutral Section)

Both Transformers are alternatively given on load

Tr-12

21.6/30.24 MVA

Vishvsas

2021

17.08.2021

New

Tr-34

21.6/30.24 MVA

Vishvsas

2021

Under Commissioning

--

--

--

B)     G-BPQ Line

7

HDM

Open Access

2 Nos.

Tr-13

21.6/30.24 MVA

ABB

2021

13.01.2023

New

(10 KMs. G End & 36 Kms. BPQ End)

Yes

--

Tr-14

13.5 MVA

BHEL

1985

30.03.2019

Done in 2018

Defective, heavy leakage of oil & tripped with Bucholz Relay.
Work sanctioned for replacement by 13.5/20 MVA released Transformers, Spare Transformer available at AKT/TSS to be commissioned.

8

WDG

--

--

--

--

--

--

--

--

 

--

TSS is coming in 2023-24.

9

NAB

Open Access

2 Nos.

Tr-17

13.5 MVA

BHEL

1985

28.05.2019

Done in 2018

(80 KMs. G End & 0 Kms. BPQ End)

Yes

Work sanctioned for replacement by 13.5/20 MVA released Transformers of main line.

Tr-18

13.5 MVA

BHEL

1985

05.12.2017

Done in 2017

10

MME

Open Access

2 Nos.

Tr-19

21.6/30.24 MVA

ABB

2021

08.12.2022

New

(49 KMs. G End & 41 Kms. BPQ End)

Yes

--

Tr-20

13.5 MVA

BHEL

1983

29.05.2020

Done in 2019

Defective, Low IR value LV to Earth.
Work sanctioned for replacement by 13.5/20 MVA released Transformers, Spare Transformer available at AKT/TSS to be commissioned.

C) G-JBP Line

11

SMC

Open Access

2 Nos.

Tr-21

21.6/30.24 MVA

ABB

2020

05.01.2021

New

(50 KMs. G End & 22 Kms. JBP End)

Yes

--

Tr-22

21.6/30.24 MVA

ABB

2020

05.01.2021

New

Yes

--

12

NIR

Open Access

2 Nos.

Tr-23

21.6/30.24 MVA

CGL

2018

18.04.2019

New

(37 KMs. G End & 7 Kms. JBP End)
(7 KMs. MFR End & 18 Kms. CWA End)

Yes

--

TR-24

21.6/30.24 MVA

ABB

2020

18.04.2019

New

Yes

--

13

GNS

Open Access

2 Nos.

Tr-25

21.6/30.24 MVA

ABB

2020

20.10.2020

New

(27 KMs. G End & 77 Kms. JBP End)

Yes

--

Tr-26

21.6/30.24 MVA

ABB

2020

20.10.2020

New

Yes

--

D) CWA-ITR Line

14

PTS

Open Access

1 No.

Tr-46

21.6/30.24 MVA

ABB

2017

16.12.2020

New

(25 KMs. NGP End & 25 Kms. CWA End)

Yes

--

15

SASR

Open Access

2 Nos.

Tr-43

21.6/30.24 MVA

ABB

2017

22.11.2019

New

(21 KMs. NGP End & 34 Kms. CWA End)

Yes

Both Transformers are alternatively given on load

Tr-44

21.6/30.24 MVA

ABB

2017

22.11.2019

New

16

LIG

Open Access

1 No.

Tr-41

21.6/30.24 MVA

ABB

2020

30.05.2019

New

(27 KMs. NGP End & 12 Kms. CWA End)

Yes

--

E) MFR-NIR-CWA

17

MFR

Open Access

1 No.

Tr-92

21.6/30.24 MVA

CGL

2018

30.08.2021

New

(30 KMs. NIR End)

Yes

--

18

CHUA

Open Access

1 No.

Tr-96

21.6/30.24 MVA

CGL

2018

05.01.2022

New

(37 KMs. NIR End & 15 Kms. CWA End)

Yes

--

19

BHV

Open Access

1 No.

Tr-94

21.6/30.24 MVA

CGL

2018

25.08.2022

New

(35 KMs. NIR End & 31 Kms. CWA End)

Yes

--

F) BTC-KGE-TMR

20

KGE

Open Access

2 Nos.

Tr-29

21.6/30.24 MVA

ABB

2022

31.03.2023

New

(48 KMs. TMR End & 43 Kms. BTC End)

Yes

'Both Transformers are alternatively given on load

Tr-30

21.6/30.24 MVA

ABB

2022

31.03.2023

New

21

CCO

--

--

--

--

--

--

--

--

 

--

TSS is coming in 2023-24.

(ii) SPs:

S. N.

List of SP

Km.

No. of BMs

Section

DUG-NGP Main Line       :

1

RSM/SP

875/3-7

3

RSM-MUP

2

MUA/SP

916/33

3

MUA-JTR

3

SKS/SP

961/4

2

DKS-SKS

4

G/SP

988/13

2

GDM-G

5

TMR/SP

1047/18

3

TMR-MNU

6

TAR/SP

1090/25

3

RRL-TAR

7

ITR/SP

1128/14-16

3

NGP-ITR-KAV

ITR-CWA Single Line:

1

KAV/SP

1400/2-3

1

ITR-KLOD

2

KLOD/SP

1350/12

1

KLOD-BMC

3

BDKD/SP

1295/4

1

CWA-SASR

G-BPQ Single Line:

1

G/SP-2

1005/13

1

G-GKT

2

SNV/SP

1050/1

1

SNV-DEW

3

WSA/SP

1105/3

1

SNV-WDG

4

SYE/SP

1172/6

1

NAB-CAF

5

CAF/SP

1241/1-2

1

CAF-BPQ

G-JBP Single Line:

1

NGDM/SP

1008/2J-3J

1

G-BRS

2

JONR/SP

1124/7J

1

JONR-PDE

3

KEQ/SP

1230/1J

1

KEQ-SKY

4

SOY/SP

1186/14J

1

JONR-PDE

5

LTA/SP

1083/5J

1

CRN-NWA

TMR-TRDI-KGE-BTC:

1

TMS/SP

1052/8

1

TMR-CCO

2

TRDI/SP

1094/3

1

CCO-KGE

3

BTC/SP

1045/1

1

BTC-KGE

CWA-NIR-MFR:

1

GPSA/SP

1252/16C-1253/1C

1

CWA-CHUA

2

SEY/SP

1

BHV-PED

3

BOTHIA/SP

1

NIR-KLZ

4

JGZ/SP

1130/13C

1

NIR-MFR

(iii) SSPs:

           

S. N.

List of SSP

Km.

No. of BMs

Section

DUG-NGP Main Line:

 

 

1

PMS/SSP

888/1

7

MUP-PMS

2

BAKL/SSP

907/3

7

BAKL-MUA

3

DGG/SSP

926/28

7

DGG-JTR

4

BTL/SSP

945/4A

7

DKS-BTL

5

DNL/SSP

970/12

7

SKS-DNL

6

GDM/SSP

988/15

3

AGN-GDM

7

GJ/SSP

1014/20

7

GJ-G

8

KWN/SSP

APML/10

3

KWN-APML

9

TRO/SSP

1029/24

7

TRO-KWN

10

K/SSP

1060/2

7

TMR-K

11

KT/SSP

1079/5

7

RRL-KT

12

CHCR/SSP

1098/28

10

CHCR-TAR

13

KP/SSP

1117/6

7

KAV-KP

14

KAV/SSP

1124/28

ITR-NGP

ITR-CWA Section:

 

 

1

ULA/SSP

1281/2-3

1

ULA-BDKD

2

BMC/SSP

1309/1

1

BDKD-SASR

3

RMO/SSP

1321/3

1

KLOD-BMC

4

LDE/SSP

1364/13

1

KLOD-BMC

5

SONR/SSP

1364/13

1

SONR-KLOD

6

KPKD/SSP

1389/5

1

KPKD-SONR

G-BPQ Single Line

 

 

1

GNL/SSP

1031/8-9

1

GNL-SNV

2

DEW/SSP

1068/9

1

SNV-WSA

3

WDG/SSP

1089/1

1

DEW-WSA

4

BMP/SSP

1116/0

1

WSA-TUD

5

TUD/SSP

1149/3

1

BMP-AWH

6

AWH/SSP

1159/15

1

NAB-CAF

7

ROL/SSP

1182/8

1

SYE-TWI

8

KEZ/SSP

1213/7

1

NAB-CAF

JBP-G Single Line:

 

 

1

GGGS/SSP

1126/3J

1

GRG-GGGS

2

BUQ/SSP

1198/2J

1

SKY-BUQ

3

SKY/SSP

1174/3J

1

VNK-SKY

4

VNK/SSP

1161/6J

1

GNS-VNK

5

NDNI/SSP

1146/5J

1

NDNI-PDE

6

PNJ/SSP

1104/5J

1

NWA-JONR

7

NWA/SSP

1092/1J

1

LTA-PNJ

8

CRN/SSP

1073/7J

1

BTC-LTA

9

BTC/SSP

1043/13J

1

G-SMC

10

HTT/SSP

1031/8J

1

HTT-BTC

11

BRA/SSP

1019/6J

1

BRA-HTT

TMR-TRDI-KGE-BTC Single Line

 

1

MTWN/SSP

1060/00

1

TMR-CCO

1

GBRI/SSP

1072/7

1

DBDZ-MTWN

2

DGBZ/SSP

1078/2

1

CCO-TRDI

3

MKZ/SSP

1086/12

1

TRDI-TMR

4

PONIYA/SSP

1097/5

1

KFX-TRDI

5

KFX/SSP

1075/7

1

BTC-KGE

6

WRI/SSP

1060/9

1

BTC-KFX

CWA-NIR-MFR Single Line

 

 

1

PUE/SSP

1153/17C-18C

1

CWA-JLY

2

JLY/SSP

1237/13C-1237/14C

1

CWA-CHUA

3

CID/SSP

1138/01M

1

NIR-MFR

4

PED/SSP

1208/37C

1

SEY-JLY

2.5 Breakdown Vehicles

S. N.

Post

Station
Qty.

1

8wheeler Tower Wagon

T/Car No.6503 (DHTC, BEML) & 6533 (DETC, ICF), 191098 (DETC, ICF), 191038 (DETC, ICF), 8W-190095 (DETC, ICF), 200082 (DETC, ICF), 8W-943003 (DETC, BEML), 8W-943011 (DETC, BEML), 8W-943019 (DETC, BEML), 8W-943020 (DETC, BEML), 8W-220054 (DETC, DMW)-Not commissioned.

11 Nos.

2

4wheeler Tower Wagon

T/Wagon No. 6039 (Mark-II) and PTL-0030 & PTL-0031(Type-OHE-IV)

3 Nos.

3

Truck (Out Sourced)

BTC,SNV &NAB, CWA, GRG, NIR, DGG, TMR, KAV, G.

9 Nos.

2.6 MAINTENANCE DEPOTS:

                                       

S. N.

Depot

Post/Station

Qty.

1.

OHE Depots

DUG-NGP Main Line: Dongargarh, Gondia, Tumsar, Kalumna,

4 Nos.

2.

PSI Depots

DUG-NGP Main Line: Dongargarh, Gondia, Kalumna,

3 Nos.

TOTAL

7 Nos.

3.

OHE & PSI Combined Depot

G-BPQ Line: Sondad, Nagbhir, Mulmarora

3 Nos.

G-JBP Line: Gwarighat, Nainpur, Balaghat

3 Nos.

CWA-ITR Line: Chhindwara, Sausar

2 Nos.

TOTAL

15 Nos.

3.

RC Depot

Nagpur

1 No.

4.

RRD Depot

Dongargarh

1 Nos.




Source : South East Central Railway CMS Team Last Reviewed : 25-07-2023  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.