About Us
   Division / Workshop
      Raipur
         Imp. Activities


 
Bookmark Mail this page Print this page
QUICK LINKS
Imp. Activities

Brief of Mechanical department/ Raipur division

A.फ्रेट गतिविधियां/Freight activities

1) आरओएच डिपो, पीपीयार्ड-भिलाई/ROH Depot, PP Yard, Bhilai.

ØPP Yard/Bhilai is mainly dealing with air brake stock including BOXN/BOXNHL/BOXNHL (MBS) wagons.

ØThe ROH depot and sick line attached to PP Yard is ISO: 9001-2008 certified.

ØAverage outturn of this depot is 700 ROH wagons per month.

ØCoal Empty Yard is attached with this depot to carry out PME, PEE and Continuity examination.

ØApproximately 08-10 rakes are being examined per day at PP Yard.

Ø207 CC rakes based at PPYD.

Ø Maintenance of 30 BOBRN CC rakes including ROH.

2) एक्‍सचेंज यार्ड, भिलाई/Exchange Yard, Bhilai.

ØThe incoming and outgoing examination of empties and loaded rakes of Bhilai Steel Plant is being done at this yard. 

ØExchange Yard/Bhilai plays a pivotal role in supply and clearance of rakes for Bhilai Steel Plant.

ØExchange Yard, Bhilai is also playing a vital role in operation of End Unloading Rakes (EUR) in SEC Railway for transportation of long rail from Bhilai Steel Plant to other Railway zones.

ØExchange yard, Bhilai is nominated for centralized maintenance of EUR rakes.

Ø53EUR rakes are maintained at this yard and unique number Bhilai Rail (BR) is given for ready reference and tracking through FOIS.

Ø ROH has been started at Ex-Yard from 27.07.2017 and avg. outturn is 56 per month and per day 02.

                            

3) रिसेप्‍शन यार्ड, भिलाई/Reception Yard, Bhilai.     

ØC&W depot Reception Yard/BMY is dealing with all types of air brake stock.

ØWork of rehabilitation of wagon is being undertaken at this depot.

ØReception Yard is also dealing for formation of Super Long Haul trains consisting of two rakes in different combination.


                                                         

4)कैरेज एवं वेगन डिपो, दल्‍लीराजहरा /C&W depot DRZ.

ØA fleet of 482 BOBSNMI wagons is maintained at DRZ.

ØBOBSNM1 rakes are fit for carrying 25 Tonne axle load.

ØTotal 8 BOBSNMI rakes are plying between DRZ – MXA for transportation of IRON ORE for Bhilai Steel Plant.

ØThis depot mainly deals with PME of BOBSNMI rakes. All 08 BOBSNMI rakes having validity of 20 roundtrip  or 30 days whichever is earlier.

B. कोचिंग मेंटनेंस गतिविधियां Coaching maintenance activities

1)  दुर्ग/Durg

ØDurg is the main coaching depot of Raipur Division.

Ø13 trains are being given Primary maintenance.

Ø04 train is being given Secondary maintenance.

Ø04 trains are being given Other End maintenance.

ØAverage holding of this depot is 307 (ICF-205 + LHB-102) coaches.

ØCleaning of coaches, depot and on onboard housekeeping services have been outsourced.

ØOBHS provided in 10 Durg based trains.

ØMechanized laundry plant has been commissioned on 04.03.12 at Coaching Depot/Durg and operational.

2)  रायपुर/Raipur

ØOther End maintenance of 01 BG Mail/ Express and 06 BG passenger trains is done at this depot.

ØContinuity checks on 16 BG mail/express & 06 BG passengers are attended at Raipur station.

ØCTS has been started at Raipur station from March 2015. and Avg. 15 trains are being attended per day..

      

आपदा प्रबंधन/DISASTER MANAGEMENT:

Following ART, ARME and Crane are available to cater accident/ derailment in exigency.

BROAD GAUGE

Station

Class of ART

Scale of ARME

140 Ton Diesel Crane

Beat of Operation

BIA

‘A’ Class

Scale - I

140T Hydraulic Diesel Crane

BIA-R-BYT

BIA-DUG-DGG

DUG-DRZ

NARROW GAUGE

Station

Class of ART

Scale of ARME

140 Ton Diesel Crane

Beat of Operation

R

‘C’ Class

Scale - I

--

R-AVP-DTR

AVP-RIM

BIA

Brake Down Mobile Truck is available at BIA for attending NG and minor yard derailment.

Work within 30 km area.

रायपुर मंडल में मौजूद रेलवे इलेक्‍ट्रिक इन मोशन वे-ब्रिज का विवरण/Details of Railway ELECTRONIC IN-MOTION WEIGHBRIDGE, in Raipur Division

All the Electronic In-motion Weighbridges have been upgraded with facility of FOIS connectivity and surveillance camera

S. No.

Place of Installation of Weighbridge

Name of OEM of Weighbridge

Date of Commissioning

Remarks

1

P-Cabin

M/s Pragati Instrumentation (P) Limited, Gurudawara Raod, Bokaro, Jharkhand

21/08/2020

All are under Warranty

2

MXA

19/11/2020

3

RSD

03/10/2020

4

DPH

03/10/2020

5

MNDH

08/12/2020

6

BYL

27/02/2020


WHEEL IMPACT LOAD DETECTOR (WILD)
व्‍हील इम्‍पैक्‍ट लोड डिटेक्‍टर

Wheel impact load detector system is commissioned on 16th Jan 2008 at Pauwara (KM-884/1) in between MXA –DRZ section of Raipur division which has been facilitated by GPRS connectivity for sending data from site (i.e Bhilai-WILD) to centralized control main server.

The WILD system shall be capable of automatic detection of defective wheel of rolling stock by measuring vertical impact load of train, the report publish on WILD website assist maintenance person in remedial action and removing the defect causing it.




Source : South East Central Railway CMS Team Last Reviewed : 24-05-2021  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.