Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
खोज :
Find us on Facebook View Content in English
National Emblem of India

हमारे बारे में

यात्री सेवा

न्यूज़/प्रेस विज्ञप्ति

अद्यतन

निविदाओं और अधिसूचनाएं

प्रदायक सूचना

सम्पर्क करें/अन्य



 
Bookmark Mail this page Print this page
QUICK LINKS
Achievement

MAJOR ACHIEVEMENTS

 

1.0Safety Related:

     ‘Hot axle detection Machine’ installed at Gondia.

2.0Freight Achievements:

ØFormation of Long hauls / Sheshnag / Anaconda :- 13 nos.Long haul rakes, 2 nos. Sheshnag & 4 nos. Anaconda has been formed in division till Jan.’2021.

<!--[if !supportLists]-->Ø<!--[endif]-->Commissioning of 02 nos. Wagon Tippler at VNK siding.

<!--[if !supportLists]-->Ø<!--[endif]-->Commissioning of 02 nos. Railway EIMWBs (Bargi & Padriganj).

<!--[if !supportLists]-->Ø<!--[endif]-->IP based CCTV Camera installed at all 03 Rly. EIMWBs of division as per Rly. Board instruction.

<!--[if !supportLists]-->Ø<!--[endif]-->Replacement of Overaged Pvt. EIMWBs - 2 EIMWBs of Pvt sidings (Sunflag / BRD & WCL/SONR).

<!--[if !supportLists]-->Ø<!--[endif]-->FOIS integration of all 12 EIMWBs of the division completed.

<!--[if !supportLists]-->ØPost tippling examination of freight rakes at Coal Unloading sidings has been continued. Total 5423 rakes have been examined till Jan.’21.

<!--[if !supportLists]-->Ø<!--[endif]-->Repair of unloadable wagons at major coal loading siding in NGP division i.e DKU. Total 3287 nos. unloadable wagons were repaired during this FY till Jan.2021. It is ensured that no wagon is allowed as unloadable at DKU siding.

<!--[if !supportLists]-->Ø<!--[endif]-->Alertness of Rolling In Staff:- 3 nos. Hot axle cases, 1 no. adapter Cant case were detected during rolling in examination by C&W staff in this FY 2020-21 till Jan.2021.

3.0Coaching:

<!--[if !supportLists]-->Ø<!--[endif]-->Maintenance of Parcel and KISAN special rakes by Coaching depot, Gondia is being done. Total 125 nos. Parcel rakes and 03 nos. KISAN rakes have been examined.

<!--[if !supportLists]-->Ø<!--[endif]-->Shramik Special Trains : - 3 nos. Shramik Special. Rakes were examined at Coaching depot, Gondia. 2 nos. inward Shramik special terminated in Nagpur division were attended.

Further, watering and sanitization of all enroute Shramik special rakes have been attended at Gondia.

<!--[if !supportLists]-->Ø<!--[endif]-->Sanitization of Jan Shatabdi Rake:- Maintaining Passenger Train service during Covid-19 period with proper follow up of Covid-19 guidelines by cleaning and disinfecting (after resumption of service of 2069/70 Janshatabdi Exp.) is being done from 01.06.2020.

 

4.0Medical Preparedness during Covid-19 period:

<!--[if !supportLists]-->Ø<!--[endif]-->Corona War Front:- 2300 nos. face mask with cotton cloth has been stitched by C&W staff and their family member for whole Nagpur Division. Further, 100 liters in house Sanitizer prepared during covid-19 pandemic.

<!--[if !supportLists]-->Ø<!--[endif]-->Isolation coaches for Covid-19 patient :- 05 nos. coaches has been converted (departmentally) into Isolation Coaches for covid-19 patients.




Source : CMS Team Last Reviewed on: 06-04-2021  


  प्रशासनिक लॉगिन | साईट मैप | हमसे संपर्क करें | आरटीआई | अस्वीकरण | नियम एवं शर्तें | गोपनीयता नीति Valid CSS! Valid XHTML 1.0 Strict

© 2010  सभी अधिकार सुरक्षित

यह भारतीय रेल के पोर्टल, एक के लिए एक एकल खिड़की सूचना और सेवाओं के लिए उपयोग की जा रही विभिन्न भारतीय रेल संस्थाओं द्वारा प्रदान के उद्देश्य से विकसित की है. इस पोर्टल में सामग्री विभिन्न भारतीय रेल संस्थाओं और विभागों क्रिस, रेल मंत्रालय, भारत सरकार द्वारा बनाए रखा का एक सहयोगात्मक प्रयास का परिणाम है.