Narrow GaugeInfrastructure
Light schedule | Two pit lines with catwalk under the covered shed. Length of the pit line is 61 Mtrs. EOT crane 03 Ton capacity is available. |
Bogie section | Bogie overhauling section with covered shed and one pit line for two locos for bogie lifting with covered shed. EOT crane 20 Ton capacity is available. |
Heavy Schedule & Transmission section | Power pack overhauling section with cover shed and 10 Ton EOT crane is available. |
Laboratory | Two imported spectrometers and other equipments for chemical & metallurgical testing are available. |
Material Handling Equipments | 03 Nos. of EOT Cranes 01 No. Fork lift Truck. |
Broad GaugeInfrastructure
- Two pit line with catwalk under the Non EOT covered shed. Length of the pit line is 24.5 Mtrs.
- New BG loco maintenance shed for 15 BG loco under construction.
DEMU Maintenance Shed, GondiaInfrastructure
Line No. 1 | 200 Mtrs. length pit line with one side catwalk under construction of phase-II project. |
Line No. 2 | 200 Mtrs length pit line with one side cat walk available. |
Line No. 3 | 45 Mtrs. length pit line under covered shed both side cat walk. EOT crane 25 Ton capacity is available |
Line No. 4 | 75 Mtrs. length (with pit of 22 meters) under covered shed without cat walk. EOT crane 25 Ton capacity is available. |