      Raipur
         Electrical (Gen.)
            Achievements


 
Bookmark Mail this page Print this page
QUICK LINKS
Achievements

Power line -

ØCable shifting of old FOB of DPH, BYL, DGS, HN, SLH station and electrification & illumination work of new FOB has been  done by departmental staff.

Ø 200 Nos 16W LED Light has been provided including wiring in pit at ELS & MEMU shed / Bhilai.

ØSolar water heater of 100LPD capacity installed in 23 Nos. Type –III, IV & V Officer Bungalow in WRS Colony Raipur and 15500LPD capacity Solar Water Heater installed in various rest houses, RPF Barrack and Running Room (total 31700LPD).

Ø13 nos. Air cooling was installed in RPF Barrack (Durg-20000 CFM-02 Nos., WRS-10000 CFM-04 Nos., Bhatapara-10000 Cfm-02 Nos., BMY-10000 CFM-02 Nos and Bhilai-10000 CFM-03 Nos) and rewiring has been done at RPF Barrack Bhilai and BMY.

Ø35 nos Type-II Quarters electrification done at DRZ and street light provision done.

ØTwo 11KV track crossing overhead line at J-cabin & Memu shed and G-cabin & Bhilai at Up Main line were removed and final termination was done by Stay & Gay arrangement departmental staff at DP at BMY yard.

ØNew 11/0415 KV-100 KVA substation in Lakholi station has been charged by RVNL and commissioning of cabling and distribution panel has been done at MNDH.

ØNew 3 phase CSPDCL connection has been taken for 7.5HP pump at Mohabhatta Gate (for Belha station water).

Ø5 Span interrupted LT overhead lines has been Shifted from Sarona station to AIIMS.

Ø03 Nos 2HP Additional Pump at TLD, SKO, BPHB, 01 Nos 5HP in BXA, 01 Nos 7.5HP For Bilha Station at Mohabhatta Gate, 01 Nos 2HP Additional Pump MDH, 02 Nos 10HP Additional DIWATTERING Pumps RUB at LC no 432 & 441, 03 City 10HP additional DIWATTERING pump H cabin RUB at LC no 433-434, Amanaka RUB and WRS filter house ,02 nos 1.0HP submersible pump at Dhaora bhata and davanbod L/C Gate installed by departmental staff.

Ø 02 Nos. 100HP Pump of WRS Filter House was automated by soft starter and Automation operation of Quick Watering System of Raipur was done by GSM System.

Ø04 nos RUB illuminated  and dewatering pump provided.

ØOld 11KV VCB panel changed with new one in 33 KV receiving sub station at DLS/R .

ØSS No.-20/BMY-250KVA Transformer augmented by 500KVA.

ØNew 2X250KVA, 11 / 0.415KV substation work completed of Durg and line charged by CSPDCL.

Air-conditioned and Train light

Ø303 nos (44 AC and 191 TL. + LHB (SS-1&SS-2) -68 (AC-31 & Non AC-37) coaches IOH done in Durg Coaching Depot.

Ø LED light retrofitted done  in 101 coaches (31 AC and 70 TL)

Ø55 coaches were converted into isolation wards for prevention of corona virus.

ØDRM Salon old battery replaced with 500AH capacity new set .

Ø HSD Oil Savings-329955 and consumption-46083 Liters in HOG Operation.

ØAll 13 Primary Rack Trip Maintenance and charging has been done for 18 Rack.




Source : South East Central Railway CMS Team Last Reviewed on: 27-05-2021  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.