|
|
|
IMPORTANT ASSETS: A)ELECTRIFIED SECTION: Description | Section | Total TKM | Main Line | BSP-DURG | 666.922 | SIDINGS | VIIPL(VIMALA ) | 0.859 | RICPL | 1.607 | SEML | 3.771 | NACAST | 5.75 | CENTURY CEMENT | 5.00 | SBPIL | 5.168 | SKS ISPAT & POWER LTD | 0.81 | CCFL (CHIDAMBARA) | 1.053 | LAFARGE | 4.50 | ACEL | 32.86 | RH | 6.00 | ULTRA TECH & GRASIM | 58.618 | HIRRI | 2.227 | NOVA | 0.280 | MCBIPL | 3.282 | NSPCL | 4.541 | JCW | 8.752 | TOTAL | | 812 | B)TRD INSTALLATIONS: Sl. No. | Switching Posts | No. of Post | Name of Post | 1 | TSS | 3 | BYT,URK,BIA | 2 | SSP | 13 | DPH,BYL,NPI,HN,BGN,SLH,BKTH URK,SZB,KMI,BIA, BQR, DUG | 3 | SP | 3 | DGS,TLD,SZB | 4 | RCC | 1 | R | C)MAINTENANCE DEPOTS: Description | Post/Station | OHE Depots | BIA, R, BYT | PSI Depots | BIA, R, BYT | RC Maintenance Depot | R | Remote Control Center | R | RRD Depot | R |
Source : South East Central Railway CMS Team Last Reviewed on: 06-01-2015
|
|
|