Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook View Content in Hindi
National Emblem of India

About Us

Passenger Services

News/Press Release

Recruitment

Tenders

Supplier Information

Contact Us/Other info



 
Bookmark Mail this page Print this page
QUICK LINKS

Achievement and Highlights of S&T department (NGP Division) for the Month Aug’18. …………………………………………………………………………………………………………………………………………………………

1)Electronic Interlocking (dual VDU) along with provision of completetrack circuiting, Data logger, BPAC, UFSBI, IPS, DG set and relay room Fire detection & fuse alarm systemhas been commissioned at Chandafort station on 12.08.18 by RE organization.

 

2)Central panel interlocking along with MACLS,track circuiting, Data logger, BPAC, UFSBI, IPS has been commissioned at Tirodi station on E route in place of Mechanical interlocking on 30.8.18. 

3)Following Mechanically Interlocked LC gates have been replaced with electrically operated LC along with with EKT less circuit as well as additional Sliding boom arrangement during Aug’18.

 

S.N

LC No.

Section/Station

Km.N.

1

GCF-117

ROL-MME

1189/6-7

2

GCF-123

MME Yard

1199/6-7

3

GCF -143

CAF Yard

1240/13-14

 

 

4)COA application for the purpose of online reporting oftrain arrival and departure through datalogger, has beencommissioned at Kalumna and Itwari stations on 29.8.18.

 

5)RE modification of S&T gear has been completed at Samnapur, Balaghat, Birsola & Hatta Road stations on E route to suite 25 KV AC railway electrification on 30.8.18

 

6)Block instruments havebeen replaced at the followingstations by overhauled block instrument :-

S.No.

Station

Section

Instrument

Date of replacement

1

Durg

Durg-Rasmara

DLBI

21.8.18

2

Jatkanhar

Jatkanhar-Dongargarh

DLBI

29.8.18

 

 

 

 

 

 

7)IPS batteries have been replaced at following stations in place of old worn-out batteries:

 

SN

Station

Nos. of batteries

Date of replacement

1

Gudma

55

1.8.18

2

Amgaon

55

6.8.18

3

Kanhan

56

8.8.18

4

Kalumna

55

8.8.18

 

8)Up gradation of M/s CEL make SSDAC to Version S007 has been completed at Nagpur-Kalumna - Itwari & Gondia - Rasmara mainline section. For this up gradation, total 526 ICs have been replaced at MLB1 & MLB2 cards of SSDAC.

 

9)PPTC fuses have been installed at 14 (Garha, Gowarighat, Burgi, Sukrimangela, Shikara, Binaiki, Ghunsore, Nidhani, Pindrai, Nainpur, Samnapur, Chiraidongri, Goberwahi, Dongribuzurg) E routestations during August’18.

 

10)Wornout Tounge rails have been replaced in coordination with Engg. Department at following stations :

 

S.N

Station

Pt. No.

Date of Replacement

S.N.

Station

Pt. No.

Date of Replacement

1

Kalumna

65A

06.8.18

15

Rasmara

44A

18.8.18

2

Mundikota

32A

06.8.18

16

Rajnandgaon

31A

06.8.18

3

Gondia

403B

06.8.18

17

Rajnandgaon

34A

21.8.18

4

Gondia

419A

25.8.18

18

Rajnandgaon

42B

21.8.18

5

Gondia

121B

11.8.18

19

Itwar

62A

11.8.18

6

Darekasa

31B

6.8.18

20

Itwari

62B

11.8.18

7

Darekasa

33A

11.8.18

21

Kalumna

62B

20.8.18

8

Paniajob

6A

06.8.18

22

Kamptee

46B

25.8.18

9

Dongargarh

46A

25.8.18

23

Kamptee

46A

25.8.18

10

Amgaon

33B

25.8.18

24

Rewral

33A

11.8.18

11

Tirora

43B

25.8.18

25

Itwari

50A

11.8.18

12

Bhandara

45A

25.8.18

26

Itwari

50B

11.8.18

13

Khat

42B

11.8.18

27

Chacher

42B

18.8.18

14

Musra

41B

18.8.18

28

Koka

34A

18.8.18

11)Old worn-out Ground connections of point machines have been replaced in coordination with Engg. Department at following stations to improve reliability of point operation:

S.N.

Station

Pt. No.

Date of Replacement

S.N.

Station

Pt. No.

Date of Replacement

1

Tharsa

31A

25.8.18

4

Rajnandgaon

34B

18.8.18

2

Rajnandgaon

42B

11.8.18

5

Rajnandgaon

39B

11.8.18

3

Rajnandgaon

34A

18.8.18

6

Musra

41B

18.8.18

 

12)COM PCB arrangement has been provided atSalekasa station having M/s Ansaldo make EI on 11.8.18.

 

13)The long section emergency socket testing between Waraseoni–Katangihas been done on 06.08.2018 by feeding with both end FC channel & gain adjustment from -3 dB to +3dB.

 

14)75 nos. of new coach guidance board system (Make : M/s. Patronies e- board, Pune) have been commissioned at Plat form No. 1,2 & 3 of Rajnandgaon station on 07.08.2018.

 

15)Extension of manual P.A. system has been done by adding 06 nos. speakers( horn type) at Arjuni station on 07.08.2018.

 

16)Railnet /Internet connectivity has been provided in following locations of Nagpur division in Aug’18.

 

Sr No

Department

No of connection

1

Safety

3

2

Personnel

4

3

Genl. Administration(DRM)

3

 

Total

10

 

 

 

 

 

 

 

17)Train indication Board (two nos.) has been commissioned at Rajnandgoan on 8.8.18

 

 

 

 

 

 

 

 

 




Source : South East Central Railway CMS Team Last Reviewed on: 27-09-2018  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.