 Achievements During March-2017

    Very important happening during March- 2017 :  

1.1   50 BOXN wagons have been rehabilitated this month and 331 wagons rehabilitated till March-17.

1.2       160 KVA DG set commissioned at DRZ.

1.3Two BCN & two BOXN loaded wagons repaired and allowed in section without detachment at RSD, BYT & HN.

1.4      Electronic in-motion weighbridge which was under breakdown since long, repaired and put in service.

1.5       99 PEE rake examine at PPYd-BIA during this month which is highest this year 16-17.

1.6         51 Revalidation work have been attended at siding (RSD- 28, BYT-HN-NPI - 23). 

1.7Total 612 rakes examined in Raipur Division in this month.

1.8      During Swachh Bharat Mission (SBM), the intensive cleaning has been carried out in 71 nos. of coaches of Durg based primary rake at coaching depot Durg in this month.

1.9      Rs 6,71,98,822 /- have been collected from M/s ACC Ltd./JCW towards hiring charges of one Diesel locomotives .

1.10    5 Running staffs were sent to MIB Nagpur for Refresher Training and 02 running staff were send for HHP loco training at KGP.

Major achievements During March-17:

2.1   ROH depot PP Yard, BIA has given an outturn of 621 ROH of wagons against the target of 635 wagons.

2.2   The average wagon ineffective percentage was 1.1 % against the target of 0.86% per month.

2.3    Total 7 BOXN (02 OFF POH, 00 C-Fit, 05 New built HL) CC rakes were formed at PP Yard, Bhilai.

2.4   ROH Depot/PP Yard has given an outturn of 1188 (621 ROH + 467 Sick repair + 100 unloadable) wagons.

2.5    299 wagons have been attended for NPOH repairs.

2.6   31 nos. super long haul trains have been formed and run.                 

2.7   18 coaches have been attended for IOH at Coaching depot, Durg.

2.8   66.37% diesel crew completed their trip within 10 hours (Sign ON to Sign OFF) and 98.15 % of the wheel movement is within 10 hrs.

2.9   Total 460 nos. of wagons have been provided with split collars at spindle rod of Hand brake wheel.

2.10 Shutdown hours of diesel locomotive is as follows in Raipur Division.

No of Loco

Shutdown Hours

Fuel Saving  in KL

Amount Saved in Rupees

414

3533:45

681.81

4263903.378/-

         *Fuel saved. March-17 Diesel price 62538.00/- KL.

                                                                                                                                 




Source : South East Central Railway CMS Team Last Reviewed on: 18-04-2017  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.