ENGINEERING

Progress of 10 important activities

Sl.

Item

Target

Pro rata

Progress

No.

target upto

upto

March-16

March-16

1

CTR (In CTR units)

 

44.16

44.16

44.69

2

Deep Screening (KM)

188.25

188.25

193.72

3

TTR (Nos.)

85

85

88.75

4

Greasing of ERC

400

400

458.17

5

Output of USFD (KM)

3435

3435

          3260.15

6

Scrap Offered to stores (MT)

5000

5000

6727.39

7

Toe load measurement (KM)

           100

100

113.76

8

Construction  of  Rainwater  harvesting

10

10

11

structures(No of stations)

9

Earning through Unconventional Sources (Lakh)

1300

1300

1778.122


10

Drawn of completion report(No of cases)

NR

NR

53



1.     Overall mobility index of the division is 104.

2.     Closed Unmanned L.C. No. DD-14, DD-16 & DD-47 by construction of LHS     

        in DUG-DRZ section.     

3.     Manning of Unmanned L.C. No. RV-13 and RV-20 in R-LAE section.

4.      Automatic Banner Flag installed at Manned Level Crossing No. RV-17 at Km.    

        21/11-12 in R-LAE section.

5.    As per MEA light weight PF shelter at work completed at RSA, GDZ & LBO   

      station.

6. New lift at Raipur station PF. No.-1 has been inaugurated on 22.03.2016 by   

       Hon’ble MP   Sri Ramesh Bais in the presence of other dignitaries.

7.   1080 mtrs. Road has been black topped at Raipur Station circulating area and   

      DRM office to Balajee Chowk.

8. Provided Auto Reversing Safety Chain System at 03 Level Crossings L.C. No. 

       DD-39,    DD-40 & DD-55.

9.      Construction of new Goods Shed at BXA has completed.


10.   Provision of Tiles in Toilets & Baths in 200 Type-II quarters in zone-1 BMY has 

        been completed.


 

11.   4.339 Tr. Km CTR has been done.


12.    3.39 Tr. Km. deep screening has been done manually at BSP-DUG section.

13. TTR of 04 Points & X-ings by T-28 at WRS (RSD Yd.) & G Cabin and 01 Derailing         switch at SZB Yd. has been done manually.

14. Deep screening of 05 Nos. of points & Crossings has been done manually in               ADEN/BYT Section.

15. Overhauling of 06 Level crossings & Road Surfacing of 11 Level crossings has             been done in ADEN/I/BIA, ADEN/II/BIA & ADEN/II/R section.

16.    19 Nos. Switches has been reconditioned by robotic method in ADEN/II/BIA    

         section.

17.     15.26 Tr. Km. dressing & boxing has been done.

18.    Overhauling of 1.654 Tr. Km & 1.4 Tr. Km shoulder screening has been done   

          manually.

19.    04 Nos. of CR (Completion Report) have been drawn. Total 53 Nos. up to the   

         month.

20     Renewal of wooden layout Derailing switch Pt. No. 41B at SZB Yd. by PSC   

         layout.

21.Elimination of buffer rail by providing SEJ in common loop at SZB Yd. Km.    

       835/13-15 & in line No. 2 at SLH Yd.

22.    During NI work at G cabin relocated Pt. No. 102B and DS-102A by new one by   

        T-28 machine for increasing CLS of holding line No. 1 & 2 to facilitated traffic.

23.    Renewal of 14 chequred plates of pathway of bridge No. 401 Down.

24.     A divisional level seminar on “Summer Precautions” has been organized on   

        19.03.2016 at Divisional conference hall, Raipur and precautionary measures to          be taken for summer discussed and reviewed in detail.

25.     A safety seminar on “Summer Precautions” has been organized on 01.03.2016         at MDH, 21.03.2016 at LAE & 26.03.2016 at SLH.

  Highest ever achievement (indicating previous best in the last 5 years) –

SN

Item or Work

Unit

Performance

Month and year of Previous best

Remarks

Achieved Now

Previous best

01

Output of USFD machine

Km.

338.50

337.50

Feb. 2015

-

02

Earning from non conventional sources

Crore

6.757

4.339

Dec-2014.

In the month of Feb-2016.



<!--[if !supportLineBreakNewLine]-->
<!--[endif]-->

<!--[if !supportLineBreakNewLine]-->
<!--[endif]-->




Source : South East Central Railway CMS Team Last Reviewed on: 22-12-2016  


  Railnet Mail Login | Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.